Parameter Viewer

Document ID us-mapwq-2026-03-01 Title Managing Aquaculture to Protect Water Quality URL https://www.epa.gov/npdes/pesticide-general-permit-electronic-reporting Jurisdiction /us Subdomain(s) none Language Status completed Analyzed at 2026-05-12 04:46:27.958501+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (23)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001reportingreportingmandatoryElectronic Submission of PGP FormsotherEPA requires the following PGP forms be submitted electronically unless granted a waiver from an EPA Regional Office: Notice of Intent (NOI), Notice of Termination (NOT), Annual ReportUnless granted a waiver from an EPA Regional Officehigh
#Q002reportingreportingmandatoryUse of NeT PGP SystemotherUnder EPA’s 2021 PGP these forms must be submitted to EPA through the NeT PGP system.Under EPA’s 2021 PGPhigh
#Q003reportingreportingmandatoryDecision-Makers Mandatory Use of NeT PGPotherPesticide Decision-makers must use the NPDES e-reporting Tool (NeT PGP) to electronically prepare and submit an NOI, NOT, or Annual Report for pesticide discharges under EPA’s 2021 PGP.For pesticide discharges under EPA’s 2021 PGPhigh
#Q004prohibitionoperationalrecommendedGeographic Scope of NeT PGP UseotherNeT PGP should only be used for pesticide discharges that are located in a geographic area where EPA is the permitting authority.high
#Q005administrativereportingmandatoryNOI Submission DeadlinesotherDecision-makers for which an NOI is required are required to submit an NOI consistent with the earliest applicable due date identified in Table 1-2 of the PGPFor Decision-makers for which an NOI is requiredhigh
#Q006administrativereportingmandatory2021 PGP Coverage Transition SubmissionotherDecision-makers who are required to submit an NOI must submit a new NOI by October 31, 2021 to obtain coverage under the 2021 PGP.Applies to Decision-makers who are required to submit an NOI following automatic termination of 2016 PGP NOIs on October 31, 2021high
#Q007administrativereportingmandatoryUse of Revised 2023 Application Formswastewater, otherApplicants for EPA-issued NPDES permits are to use the new application forms as revised in 2023 posted below.Applies to applicants for NPDES permits issued by an EPA regional office.high
#Q008administrativereportingmandatoryPhysical Signature Requirementwastewater, otherYou must print and then sign the form as EPA does not accept electronic signatures on individual NPDES permit applications.high
#Q009administrativereportingmandatoryValid Signature for Completenesswastewater, otherThe NPDES regulations require a valid signature on all applications for individual NPDES permits for them to be deemed complete (see instructions for each form).high
#Q010administrativereportingmandatoryForm 1 Requirementwastewater, otherAll applicants for individual NPDES permits, with the exception of publicly owned treatment works (POTWs) and other treatment works treating domestic sewage (TWTDS), must complete Form 1.Except for POTWs and TWTDShigh
#Q011administrativereportingmandatoryPOTW Form 2A RequirementwastewaterComplete this form if your facility is a new or existing POTW.New or existing POTWhigh
#Q012administrativereportingmandatoryCAFO/CAAP Form 2B Requirementagricultural water, wastewaterComplete this form and Form 1 if your facility is a new or existing concentrated animal feeding operation (CAFO) or concentrated aquatic animal production (CAAP) facility.New or existing CAFO or CAAPhigh
#Q013administrativereportingmandatoryExisting Process Wastewater Form 2C RequirementwastewaterComplete this form and Form 1 if your facility is an existing manufacturing, commercial, mining, or silvicultural facility that currently discharges process wastewater.Existing manufacturing, commercial, mining, or silvicultural facility discharging process wastewaterhigh
#Q014administrativereportingmandatoryNew Process Wastewater Form 2D RequirementwastewaterComplete this form and Form 1 if your facility is a new manufacturing, commercial, mining, or silvicultural facility that has yet to commence discharge of process wastewater.New manufacturing, commercial, mining, or silvicultural facility not yet discharging process wastewaterhigh
#Q015administrativereportingmandatoryNonprocess Wastewater Form 2E RequirementwastewaterComplete this form and Form 1 if your facility is a new or existing manufacturing, commercial, mining, or silvicultural facility that discharges only nonprocess wastewater.Facility discharging only nonprocess wastewaterhigh
#Q016administrativereportingmandatoryIndustrial Stormwater Form 2F RequirementwastewaterComplete this form and Form 1 if you are a new or existing facility whose discharge is composed entirely of stormwater associated with industrial activity, excluding discharges from construction activity under 40 CFR 122.26(b)(14)(x) or (b)(15).Discharge composed entirely of industrial stormwaterhigh
#Q017administrativereportingmandatoryMixed Stormwater/Non-stormwater RequirementwastewaterIf your discharge is composed of stormwater and non-stormwater, you must complete Forms 1 and 2F, and you must complete Form 2C, 2D, or 2E, as appropriate.Discharge composed of both stormwater and non-stormwaterhigh
#Q018administrativereportingmandatoryTWTDS Form 2S RequirementwastewaterComplete Form 2S if you are a new or existing TWTDS.New or existing treatment works treating domestic sewage (TWTDS)high
#Q019administrativereportingrecommendedState-Specific Form Determinationwastewater, otherIf you are located in a jurisdiction in which a state administers the NPDES program, you should contact the state to determine the appropriate application form(s) to submit.Facility located in an authorized state jurisdictionhigh
#Q020administrativeoperationalmandatoryApplication Tip Sheet Reviewwastewater, otherBefore completing the forms, review [ ] (85.36 KB)Prior to completing NPDES application formshigh
#Q021administrativereportingrecommendedForm Completion and Submission Procedurewastewater, otherYou should enter your facility information on the form, print it, sign it, and mail the form to the address stated in the instructions.high
#Q022administrativeoperationalrecommendedAcrobat Reader Usage for PDF FormsotherFor the best results, use Adobe Acrobat Reader DC to open these filesOpening fillable PDF application formshigh
#Q023administrativereportingmandatoryConsultation of General Instructionswastewater, otherTo determine the specific forms you must complete, consult the 'General Instructions' for this form.Applying for individual NPDES permits using Form 1high

P Quantitative Requirements (0)

No quantitative requirements.

D Definitions (21)

Req ID Category Name Context Confidence
#D001Direct Potable ReuseDPR is the planned introduction of recycled water either directly into a public drinking water system, or into a raw water supply immediately upstream of a drinking water treatment plant.high
#D002LRVlog removal valuehigh
#D003DDWDivision of Drinking Waterhigh
#D004DPRDirect Potable Reusehigh
#D005ABAssembly Billhigh
#D006NWRINational Water Research Institutehigh
#D007WRFWater Research Foundationhigh
#D008QMRAQuantitative Microbial Risk Assessmenthigh
#D009SOPsstandard operating procedureshigh
#D010NTAnon-targeted analysishigh
#D011chemical peaksrapid, short-lived increases in concentrationhigh
#D012SARS-CoV-2the virus responsible for COVID-19high
#D013Framework Addenduman early draft of the anticipated criteria for direct potable reuse that was developed using information from the recommended DPR research as required by section 13561.2 of the Water Codehigh
#D014DPRiska Shiny web-based applicationhigh
#D015CLIPCalifornia Laboratory Intake Portalhigh
#D016CCRsConsumer Confidence Reportshigh
#D017ELAPEnvironmental Laboratory Accreditation Programhigh
#D018EARElectronic Annual Reportshigh
#D019PFASPer- and Polyfluoroalkyl Substanceshigh
#D020CalEPACalifornia Environmental Protection Agencyhigh
#D021SWRCBState Water Resources Control Boardhigh