Parameter Viewer

Document ID us-ca-ocst-2026-05-07 Title Ocean Standards URL https://www.waterboards.ca.gov/water_issues/programs/ocean/asbs.html Jurisdiction /us/ca Subdomain(s) none Language Status completed Analyzed at 2026-05-12 04:58:37.564791+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (11)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#R001monitoringunknownmandatoryCEC Monitoring Requirementdrinking waterAll operating indirect potable reuse facilities must monitor for constituents of emerging concern (CECs) pursuant to Attachment A of the Recycled Water Policy.Applies to all operating indirect potable reuse facilitieshigh
#R002administrativereportingmandatoryQAPP Submission Requirementdrinking waterA quality assurance project plan (QAPP) must be submitted by each facility in advance of beginning the CEC monitoring program pursuant to the Recycled Water Policy.Prior to beginning the CEC monitoring programhigh
#R003reportingreportingmandatoryAnnual Volumetric Reporting Requirementwastewater, otherannual reporting requirements statewide for the volume of recycled water produced and used as well as the volume of wastewater treated and discharged.Statewide requirementhigh
#R004administrativeoperationalmandatoryDirect Potable Reuse Permit Requirementdrinking waterPrior to being allowed to engage in DPR, a public water system must first obtain a permit from the State Water Board’s Division of Drinking Water.Prior to being allowed to engage in Direct Potable Reuse (DPR)high
#R005administrativeoperationalmandatoryGeneral Water Reclamation Enrollmentother, wastewaterAll appropriate and eligible proposed nonpotable recycled water proponents with the capability of taking on the responsibility of administrating water recycling programs must enroll under the statewide general Water Reclamation Requirements for Recycled Water Use (Order No. WQ 2016-0068-DDW) to provide permit coverage to distribute and/or use recycled water.Applicable to eligible proposed nonpotable recycled water proponentshigh
#R006designoperationalmandatoryTitle 22 Engineering Reportother, wastewater, drinking waterTo recycle water, a project will need to demonstrate compliance with California Code of Regulations, title 22. This includes preparing an engineering report to describe the treatment process, intended end uses, and additional safety measures.All projects seeking to recycle waterhigh
#R007administrativeoperationalmandatoryWastewater Change Petition Checklistother, wastewaterRecycled water projects must also complete a checklist to assist the State Water Board’s Division of Water Rights in evaluating whether a wastewater change petition will be necessary prior to implementing a recycled water project: Water Code Section 1211- Wastewater Change Petition Checklist.Prior to implementing a recycled water projecthigh
#R008reportingreportingmandatoryMonthly Volumetric Reportingwastewater, otherThe Water Boards require wastewater and recycled water dischargers (including dischargers that do not produce any recycled water) to annually report monthly volumes of influent, wastewater produced, and effluent, including treatment level and discharge type through the Volumetric Annual Report.Applies to all wastewater and recycled water dischargershigh
#R009administrativeoperationalmandatoryIndustrial General Permit Coverage RequirementotherIndustrial facilities such as manufacturers, landfills, mining, steam generating electricity, hazardous waste facilities, transportation with vehicle maintenance, larger sewage and wastewater plants, recycling facilities, and oil and gas facilities are typically required to obtain Industrial General Permit coverage.Applies to industrial facility categories defined in 9 federal categories and Attachment A of the permit.high
#R010monitoringoperationalmandatoryTMDL Requirement Identification Responsibilityotherit is ultimately the responsibility of the Discharger to identify applicable TMDL requirements by identifying the facility’s: 1) receiving waterbody(ies), 2) the pollutants discharged, and 3) applicable requirements in Attachment E of the Industrial General Permit.Applies to facilities discharging to TMDL waterbody(ies) or watersheds.high
#R011administrativereportingmandatorySMARTS Registration RequirementotherIf industrial facility requires permit coverage you can review the types of permit coverage and the register to obtain coverage through SMARTSApplicable if an industrial facility requires permit coverage.high

P Quantitative Requirements (0)

No quantitative requirements.

D Definitions (12)

Req ID Category Name Context Confidence
#D001State Water BoardState Water Resources Control Boardhigh
#D002Water BoardsState Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards (collectively, the Water Boards)high
#D003Industrial General PermitStatewide General Permit for Stormwater Discharges Associated with Industrial Activities, Order 2014-0057-DWQhigh
#D004SICStandard Industrial Classificationhigh
#D005QISPQualified Industrial Storm Water Practitionerhigh
#D006HUC-10Hydrologic Unit Code 10high
#D007TMDLTotal Maximum Daily Loadhigh
#D008ELAPEnvironmental Laboratory Accreditation Programhigh
#D009IGPIndustrial General Permithigh
#D010QSDQualified SWPPP Developerhigh
#D011QSPQualified SWPPP Practitionerhigh
#D012CalEPACalifornia Environmental Protection Agencyhigh