Parameter Viewer

Document ID ca-peredi-2026-04-01-2 Title Pesticides Regulatory Directorate URL https://www.canada.ca/en/health-canada/corporate/about-health-canada/branches-agencies/pest-management-regulatory-agency.html Jurisdiction /ca Subdomain(s) none Language Status completed Analyzed at 2026-05-13 15:14:45.931321+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (20)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativehealthmandatoryPesticide Registration EvaluationotherUnder authority of the Pest Control Products Act , Health Canada: registers pesticides after a stringent, science-based evaluation that ensures any risks are acceptable;Under authority of the Pest Control Products Acthigh
#Q002administrativehealthmandatoryPesticide Re-evaluation CycleotherUnder authority of the Pest Control Products Act , Health Canada: re-evaluates the pesticides currently on the market on a 15-year cycle to ensure the products meet current scientific standards;Applies to pesticides currently on the markethigh
#Q003corrective_actionoperationalmandatoryCompliance Verification and EnforcementotherHealth Canada also promotes and verifies compliance with the Act and enforces situations of non-compliance warranting action.In situations of non-compliance warranting actionhigh
#Q004reportingreportingguidancePublication Notification SubscriptionotherEveryone is welcome to sign up for the RSS feed to be notified when publications are made available.medium
#Q005administrativeunknownguidancePesticides Information Service InquiryotherIf you have a question that is not answered on this site, please contact the Pesticides Information Service.If you have a question that is not answered on this sitehigh
#Q006administrativeunknownrecommendedMedia Room AccessotherMembers of the media are encouraged to visit Health Canada's media room.For members of the mediahigh
#Q007administrativereportingguidanceElectronic Payment ProcedureotherPlease follow the procedures for electronic payments to ensure we can continue to assess and issue your permit.Applicable when processing disposal at sea fees during pandemic landscapehigh
#Q008prohibitionoperationalmandatoryPermit Requirement ProhibitionotherDisposal at sea is prohibited without a permit.high
#Q009administrativeoperationalguidancePermit Renewal EligibilityotherRoutine, low risk projects may be eligible to be renewed up to 4 times.Applies to routine, low risk projectshigh
#Q010monitoringhealthmandatoryEnvironmental Monitoring GoalotherEnsuring permit conditions protect human health and the marine environment.Applicable to disposal site environmental monitoringhigh
#Q011administrativeoperationalmandatoryEffluent Deposit Authorizationwastewater, aquatic lifeThese regulations authorize the deposit of effluent from metal and diamond mines into water frequented by fish under subsection 36(3) of the Fisheries Act.Effluent deposit into water frequented by fishhigh
#Q012treatmentoperationalmandatoryEffluent Quality Compliancewastewater, aquatic lifesetting strict limits on the quality of effluent that can be dischargedDischarge of mine effluenthigh
#Q013monitoringreportingmandatoryEffluent Testing, Monitoring, and Reportingwastewater, aquatic liferequiring effluent testing, monitoring and reporting.Mine effluent discharge operationshigh
#Q014administrativeoperationalmandatoryFinancial Guarantee Requirementwastewater, aquatic lifeamendments to subsection 27.1(3) on financial guarantee requirementsEkati Mine Projecthigh
#Q015treatmenttreatmentmandatoryWastewater Effluent Quality Standards CompliancewastewaterThe Wastewater Systems Effluent Regulations set national minimum effluent quality standards. These standards can be met through secondary-level wastewater treatment.high
#Q016administrativeoperationalmandatoryTransitional Authorization Extension DeadlineswastewaterIt allows an extension to upgrade a wastewater system by the end of 2020, 2030 or 2040. The extension deadline is based on environmental risk.Applicable to communities with systems not designed to meet regulatory standardshigh
#Q017monitoringreportingmandatorySite-Specific Effluent Standards and MonitoringwastewaterIt also sets site specific effluent standards and monitoring and reporting requirements.Under a transitional authorizationhigh
#Q018operationaloperationalmandatoryTemporary Bypass Risk CategorizationwastewaterBypasses fall into a category depending on their risk to the receiving environment. Lower risk releases fall under a Category 1. Medium risk releases fall under a Category 2. Higher risk releases fall under a Category 3.For planned maintenance and construction releaseshigh
#Q019treatmenttreatmentmandatoryUn-ionized Ammonia Release Requirementswastewater, aquatic lifeThe environment where wastewater is released must however be able to absorb the un-ionized ammonia. The wastewater must also meet the other effluent limits of the Regulations.Applicable systems with un-ionized ammonia issues under temporary authorizationhigh
#Q020administrativereportingmandatoryUn-ionized Ammonia Authorization DurationwastewaterThese authorizations are issued for three years and can be extended.Applicable to temporary authorizations for un-ionized ammoniahigh

P Quantitative Requirements (0)

No quantitative requirements.

D Definitions (13)

Req ID Category Name Context Confidence
#D001Completedmeans that a wastewater system has been upgraded to meet the Wastewater Systems Effluent Regulations (WSER) effluent quality standards or has been decommissionedhigh
#D002Expiredmeans extension deadline has passed and the transitional authorization is no longer validhigh
#D003In progressmeans that the wastewater system still has an active transitional authorization in placehigh
#D004WSERWastewater Systems Effluent Regulationshigh
#D005physical or biological treatmentwastewater effluent undergoes treatment to remove suspended solids or organic matter before depositmedium
#D006no treatmentwastewater effluent receives no treatment or only preliminary treatment before depositmedium
#D007wastewater mixed with stormwaterconstruction or maintenance work temporarily reduces the treatment capacity of the system. As a result, untreated wastewater mixed with stormwater can overflow during rainfall eventsmedium
#D008Transitional authorizationextension to allow facilities to upgrade their systems to meet national standardshigh
#D009Temporary bypass authorizationauthorization to exceed the standards for maintenance or construction workhigh
#D010Temporary authorization to deposit un-ionized ammoniaauthorization for systems that have issues with ammonia but meet the other effluent limitshigh
#D011Category 1Lower risk releases fall under a Category 1.high
#D012Category 2Medium risk releases fall under a Category 2.high
#D013Category 3Higher risk releases fall under a Category 3.high