Parameter Viewer

Document ID ca-on-toronto-mtdsf-2 Title Manufactured Treatment Device Summary Form URL https://www.toronto.ca/legdocs/municode/1184_441-d.pdf Jurisdiction /ca/on/toronto Subdomain(s) none Language Status completed Analyzed at 2026-05-12 03:25:04.466782+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (6)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#R001administrativereportingmandatoryMTD Summary Form Completion and SubmissionotherMTD Summary Form to completed in accordance with Design Criteria for MTDs and appended as part of Stormwater Management Reporthigh
#R002administrativereportingmandatorySubmission of MTD DocumentationotherAttachments with SWM Report [select all applicable]: MTD Engineering Drawings, Verification Statements/Certification Report, MTD Sizing and Performance Calculation Sheet, Hydraulic Calculations for Inline/Offline Installation, Operations & Maintenance Manualhigh
#R003designtreatmentmandatoryTesting and Verification ProtocolsotherTesting / Verification / Certification [select one]: [For OGS] Canada ETV OGS Lab Protocol + ISO 14034: ETV Verification; [For Filter Device] TAPE Field Test Protocol 1 + TAPE Certification; [For Filter Device] TAPE Field Test Protocol 1 + ISO 14034: ETV VerificationDependent on device type (OGS or Filter)high
#R004designoperationalmandatoryInstallation Configuration RequirementsotherInstallation Configuration [select Option A, B or C]: A. Inline OGS: Internal By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow Rate; and Internal By-pass Capacity > Inlet Pipe Capacity minus Maximum Scour Flow Rate; and Maximum Scour Concentration at Maximum Tested Scour Flow Rate <= 25mg/L. B. Inline Filter: Internal By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow Rate. C. Off-line OGS or Filter: Diversion By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow Rate.Applies based on the selected installation configuration (Option A, B, or C)high
#R005operationaloperationalmandatoryOperations & Maintenance Criteriaother[For OGS] Provided MTD Storage Capacity > Annual Sediment Loading Volume; [For Filter Device] Manufacturer Designed and Recommended Maintenance IntervalApplies to OGS or Filter Devices respectivelyhigh
#R006designtreatmentmandatoryMTD Scaling ProvisionsotherScaling Provisions Metapplicable where proposed model is not the same as tested modelhigh

P Quantitative Requirements (11)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001operationaloperationalmandatoryIndustrial process use volume thresholdotherrequirement> 5000 cubic metres per yearApplicable to industrial process use for eligible property or portions of propertyApplicable to volume of water consumed over 5,000 cubic metres per yearhigh
#P002designoperationalmandatoryFountains orifice sizeotherrequirement<= 1.6 mmFlat Rate Consumers - Former City of TorontoFor 1.6mm orifice or less, each per seasonhigh
#P003chemicaltreatmentmandatoryIndustrial Waste Surcharge - Biochemical Oxygen Demand (BOD) or Phenolics (4AAP)wastewaterrequirement0.64 $/kgRevenues - Environment & AdministrationIndustrial Waste Surchargehigh
#P004physicaltreatmentmandatoryIndustrial Waste Surcharge - Total Suspended Solids (TSS)wastewaterrequirement0.70 $/kgRevenues - Environment & AdministrationIndustrial Waste Surchargehigh
#P005chemicaltreatmentmandatoryIndustrial Waste Surcharge - Total Phosphorus (TP)wastewaterrequirement2.24 $/kgRevenues - Environment & AdministrationIndustrial Waste Surchargehigh
#P006chemicaltreatmentmandatoryIndustrial Waste Surcharge - Total Kjeldahl Nitrogen (TKN)wastewaterrequirement1.43 $/kgRevenues - Environment & AdministrationIndustrial Waste Surchargehigh
#P007physicaltreatmentmandatoryMaximum Scour Concentrationwastewaterrequirement<= 25 mg/LInstallation Configuration - Inline OGSAt Maximum Tested Scour Flow Ratehigh
#P008operationaltreatmentmandatoryDesign Annual Rainfall Volume Capturewastewatertreatment_goal90 %Sizing evaluation and bypass capacity calculationsFor Filter design treatment flow and OGS/Filter bypass thresholdshigh
#P009operationaltreatmentmandatoryMinimum Rainfall Capture Eventswastewaterrequirement>= 3 eventsTesting protocol requirements for filter devicesEvents must correspond to rainfall intensity and depth of 90% average annual rainfall volumehigh
#P010designtreatmentmandatoryMaximum Treatment Depth Sediment Factorwastewaterrequirement50 %Formula for calculating Maximum Treatment DepthSubtracted from Chamber Depth as percentage of Maximum Sediment Storage Depthhigh
#P011operationaltreatmentmandatoryAnnual Rainfall Volume Captured Intensity Rangewastewaterrequirement10 to 100 %Calculation range for design intensitiesFor OGS sizing and performance evaluationhigh

D Definitions (10)

Req ID Category Name Context Confidence
#D001MTDManufactured Treatment Devicehigh
#D002Chamber depthChamber depth is measured from the outlet invert to the bottom of the device.high
#D003Maximum Treatment DepthMaximum Treatment Depth = Chamber Depth minus 50% of Maximum Sediment Storage Depthhigh
#D004Sediment Storage CapacityMeasured from the bottom of the device to manufacturer-recommended sediment cleanout depthhigh
#D005TAPE Field Test Protocol 1Includes capture of min 3 events with rainfall intensity and depth corresponding to 90% average annual rainfall volumehigh
#D006OGSOil-Grit Separatorhigh
#D007SWMStormwater Managementhigh
#D008Design Treatment FlowsCalculated range for design intensities corresponding from 10% to 100% of Annual Rainfall Volume Capturedhigh
#D009Design Surface Loading RatesCalculated range for design intensities corresponding from 10% to 100% of Annual Rainfall Volume Capturedhigh
#D010Removal EfficiencyCalculated range for design intensities corresponding from 10% to 100% of Annual Rainfall Volume Capturedhigh