Parameter Viewer

Document ID ca-on-or6rupia-2025-07-01 Title O. Reg. 63/16: REGISTRATIONS UNDER PART II.2 OF THE ACT - WATER TAKING URL https://www.ontario.ca/laws/regulation/190208 Jurisdiction /ca/on Subdomain(s) none Language Status completed Analyzed at 2026-05-12 03:55:30.316213+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (24)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeunknownmandatoryPrescribed Persons for Sewage WorkswastewaterSubject to subsection (2), any person who alters, extends, enlarges or replaces a sewage works on or after July 1, 2021 is prescribed for the purposes of clauses 20.6 (1) (a) and (c) of the Act.Subsection (1) applies if the altering, extending, enlarging or replacing is carried out under an agreement with a municipality (under the Planning Act or Development Charges Act, 1997) or an agreement between a municipality and Metrolinx or another transit authority; and the agreement provides that ownership of the sewage works may be transferred to the municipality, a public utility commission, a municipal service board, a city board, or a municipal corporation.high
#Q002monitoringoperationalmandatoryWater Taking Log MaintenanceotherA log shall be maintained at the location of the water taking that sets out, with respect to each day water is taken from the water body, i. the date, ii. the name of the water body, iii. the location of each water taking, iv. the average rate at which water was taken in litres per second, v. if the water body is a stream, the flow rate of the stream as calculated under subparagraph 1 ii, vi. the total volume of water taken in litres, and vii. any additional information required by the water body report.Applicable to highway and transit projects registered in the Registry.high
#Q003reportingreportingmandatoryAnnual Water Taking ReportingotherOn or before March 31 in each year, the person engaging in the activity shall provide the Director with a report, in a form and manner approved by the Director, setting out the volume of water taken daily with respect to each water body from which water was taken in the previous calendar year.Applies to highway, transit, and construction site dewatering projects.high
#Q004operationaloperationalmandatorySpill Clean-up Equipment AvailabilityotherSpill clean-up and containment equipment that is designed to contain or absorb oil, fuel and lubricant shall be available at the site of the water taking for the period during which the taking of water occurs.high
#Q005reportingreportingmandatoryEnvironmental Complaint NotificationotherIf the person receives a complaint with respect to the taking of water and the complaint relates to the natural environment, the Ministry shall be notified of the complaint immediately after the complaint is received.high
#Q006prohibitionaestheticmandatoryPetroleum Sheen ProhibitionwastewaterWith respect to any ground water or storm water, or both, that is discharged into the natural environment or a storm sewer, there shall be no visible petroleum hydrocarbon film or sheen present.Applicable to construction site dewatering and pumping test discharges.high
#Q007administrativereportingmandatoryExtended Taking Municipal NotificationotherIf the taking of water is intended to continue for more than 365 days from the proposed start date of the water taking, the person proposing to engage in the activity shall give written notice that includes the information set out in subsection (2) to, i. the upper-tier and lower-tier municipalities or the single-tier municipality, as the case may be, within whose area of jurisdiction the proposed water taking is located, and ii. any conservation authority within whose area of jurisdiction the proposed water taking is located.Applies when taking is intended to exceed 365 days.high
#Q008administrativereportingmandatoryRegistration Pre-conditions for Water TakingotherA person who proposes to engage in an activity prescribed by section 2 shall not register the activity in the Registry until the following conditions are met, as applicable: 1. The person proposing to engage in the activity has received a copy of a water body report that is prepared by a person who meets the qualifications set out in subsection (2) and includes the information and statements set out in subsection (3).Applicable to highway or transit projects.high
#Q009administrativereportingmandatoryWater Taking Completion NoticeotherIf the taking of water is no longer needed, within 30 days after the day the person has ceased to engage in the activity they shall give notice to the Ministry that the water taking is complete by filing that information in the Registry.Applies to highway, transit, dewatering, and pumping test registrations.high
#Q010administrativeoperationalmandatoryRegulatory Record RetentionotherA person who engages in an activity prescribed by section 2 shall ensure that each of the following documents or records is retained for a period of five years from the day it is required to be created or from the last day it is updated, as the case may be: 1. A copy of each water body report. 2. If a methodology other than the methodology set out in the water body report is used, a copy of that methodology. 3. Each log referred to in paragraph 4 of subsection 4.1 (1). 4. A record of the following information with respect to each complaint referred to in paragraph 7 of subsection 4.1 (1): i. The date and time the complaint was received. ii. A copy of the complaint, if it is a written complaint. iii. A summary of the complaint, if it is not a written complaint. iv. A summary of measures taken, if any, to address the complaint.Five-year retention period applies to all prescribed water taking records.high
#Q011monitoringoperationalmandatoryStream Flow Rate Calculationotherbefore the taking of water each day, the flow rate of the stream shall be calculated using the methodology set out in the water body report referred to in paragraph 1 of subsection 4 (1) or another methodology prepared by a person who meets the qualifications set out in subsection 4 (2).Applies to water taking from permanent streams for highway/transit projects.high
#Q012administrativereportingmandatory10-Year Water Body Report UpdateotherIf the taking of water continues for 10 years from the day it began, the person shall ensure that the information referred to in subsection 4 (3) with respect to the water body report is updated within 30 days.Applies to long-term highway or transit water taking projects.high
#Q013treatmenttreatmentmandatoryImplementation of Recommended Discharge MethodwastewaterSubject to paragraphs 5 and 6, the method of transfer or discharge recommended in the discharge report shall be implemented with respect to the ground water or storm water, or both, that is taken for the purposes of dewatering the construction site.Applicable to all construction site dewatering activities.high
#Q014operationaloperationalmandatoryErosion and Sediment Control MaintenanceotherAny erosion, flooding, scouring, sediment and total suspended solids control measures identified in the discharge report shall be used, operated and maintained in a manner that satisfies the recommendations of the manufacturer of the control measures or as directed in the discharge report if no such recommendations exist.Applicable to construction site dewatering discharges.high
#Q015corrective_actionoperationalmandatoryContingency Plan and Shutdown Protocol ImplementationotherAny measures identified in the contingency plans set out in the water taking report, pursuant to paragraph 10 of subsection 8 (4), and the discharge report, pursuant to paragraph 7 of subsection 8 (5), shall be implemented if the applicable circumstances arise. Any shutdown protocol... shall be implemented if the applicable circumstances arise.Applies to construction site dewatering when contingency triggers are met.high
#Q016administrativereportingmandatoryInspection of Water Body ReportotherA copy of the water body report shall be provided in paper or electronic format for inspection upon request.Applicable to highway and transit projects.high
#Q017administrativereportingmandatoryConstruction Dewatering Notification ProtocolotherPrior to the commencement of the activity, the notification protocol shall be implemented in accordance with the protocol set out in the water taking report pursuant to paragraph 12 of subsection 8 (4).Applicable to construction site dewatering projects.high
#Q018administrativereportingmandatoryInspection of Dewatering Reportsother, wastewaterA copy of the water taking report and the discharge report shall be provided in paper or electronic format for inspection upon request.Applicable to construction site dewatering projects.high
#Q019operationaloperationalmandatoryRecovery and Disposal of Dewatering Control MeasuresotherAll control measures referred to in paragraph 7 and all materials collected or trapped by those measures shall be recovered and disposed of when the person is no longer engaging in the activity.Applicable upon cessation of dewatering activities.high
#Q020administrativereportingmandatoryConstruction Dewatering Record KeepingotherA person who engages in an activity prescribed by section 7 shall ensure that each of the following records with respect to the taking of ground water, storm water or both is created and retained for a period of five years from the day it is required to be created: 1. The dates on which the person engaged in the activity prescribed by section 7. 2. For each day on which ground water, storm water or both was taken, the average rate at which it was taken from each dewatered work area in litres per second. 3. The volume of ground water, storm water or both taken from each dewatered work area each day in litres. 4. A record of the following information with respect to each complaint referred to in paragraph 12 of subsection 9.1 (2)... 5. A record of any precipitation on the construction site. 6. A copy of any information or documents that demonstrate notice was provided... 7. A copy of the records related to the monitoring plans...Five-year retention period for dewatering projects.high
#Q021administrativereportingmandatoryInspection of Pumping Test Design ReportotherA copy of the pumping test design report shall be provided in paper or electronic format for inspection upon request.Applicable to pumping test projects.high
#Q022operationaloperationalmandatoryPerformance of Pumping TestotherThe pumping test shall be performed in accordance with the pumping test design report and in accordance with any subsequent modifications to the report that have been approved by the person who prepared the report.high
#Q023operationaloperationalmandatoryRecovery and Disposal of Pumping Test Control MeasuresotherAll control measures referred to in paragraph 8 and all materials collected or trapped by those measures shall be recovered and disposed of when the person is no longer engaging in the activity.Applicable upon cessation of pumping test activities.high
#Q024monitoringoperationalmandatoryPumping Test Monitoring ImplementationotherA monitoring plan shall be implemented in accordance with the plan set out in the pumping test design report.high

P Quantitative Requirements (22)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001physicaloperationalmandatoryLake surface area threshold for prescribed activityotherrequirement> 10 hectaresCriteria for water body being a lake for highway/transit project water takingApplies to water bodies identified as lakeshigh
#R002operationalreportingmandatoryDaily water taking volume for registration (Highway/Transit)otherrequirement> 50,000 litresThreshold for taking of water to be a prescribed activity requiring registrationTaking of water on at least one dayhigh
#R003operationaltreatmentmandatoryInstantaneous stream water taking rateaquatic liferequirement<= 5 %Maximum instantaneous rate of water taking from a permanent streamCalculated as percentage of the stream flow rate at the point of takinghigh
#R004operationalreportingmandatoryLong-term water taking notification thresholdotherrequirement> 365 daysDuration threshold requiring written notice to municipalities and conservation authoritiesTaking intended to continue beyond this duration from proposed start datehigh
#R005operationaloperationalmandatoryWater body report update intervalotherrequirement10 yearsTime period after which water body report information must be updatedIf taking of water continues for this durationhigh
#R006operationalreportingmandatoryRegistration completion filing windowotherrequirement30 daysWindow to notify Ministry that water taking is completeApplies after person has ceased to engage in the activityhigh
#R007operationalreportingmandatoryRecord retention periodotherrequirement5 yearsPeriod for which reports, logs, and methodologies must be retainedFrom day record is created or last updatedhigh
#R008operationalreportingmandatoryDaily water taking volume for registration (Construction)otherrequirement> 50,000 litresCombined threshold of ground water and storm water for construction site dewateringAmount taken on at least one dayhigh
#R009physicalhealthmandatoryDischarge turbidity limitaquatic lifeMAC<= 8 Nephelometric Turbidity UnitsMaximum turbidity allowed above background levels for dischargeDischarge into natural environment or storm sewer within 30 metres of a water bodyhigh
#R010physicaloperationalmandatoryProximity threshold for turbidity regulationaquatic liferequirement30 metresDistance from a water body triggering specific turbidity limits for dischargehigh
#R011operationalreportingmandatoryMinimum water taking for pumping test registrationotherrequirement> 50,000 litresMinimum amount taken on at least one day for pumping test activityhigh
#R012operationalreportingmandatoryMaximum water taking for pumping test registrationotherrequirement<= 5,000,000 litresMaximum daily limit for pumping test to qualify as a prescribed activity under this PartPer day limithigh
#R013operationaloperationalmandatoryMaximum duration for pumping test activityotherrequirement<= 7 daysMaximum number of days over which water taking occurs for a pumping testMust occur within a 30-day periodhigh
#R014operationaloperationalmandatoryWindow for pumping test durationotherrequirement30 daysTime window during which the 7 days of pumping test water taking must occurhigh
#R015operationalreportingmandatoryPumping test notice lead timeotherrequirement48 hoursMinimum notice time provided to other water users before starting pumping testPrior to commencement of the pumping testhigh
#R016physicaloperationalmandatoryMinimum stream order for highway/transit project water takingotherrequirement>= 3 orderRequirement for permanent streams to be a prescribed activityIf the water body is a permanent streamhigh
#R017operationalreportingmandatoryConstruction dewatering notice lead timeotherrequirement>= 48 hoursNotice lead time provided to other water users and Ministry district officeBefore the commencement of the initial taking of waterhigh
#R018operationalreportingmandatoryConstruction water taking completion notice windowotherrequirement30 daysTimeframe to notify Ministry that water taking is completeAfter the day the person has ceased to engage in the activityhigh
#R019operationaloperationalmandatoryWater body report information update timeframeotherrequirement30 daysDeadline to update report information after 10 years of continuous water takingIf the taking of water continues for 10 years from the day it beganhigh
#R020operationalreportingmandatoryRecord retention period (Construction Dewatering)otherrequirement5 yearsRetention period for records related to construction site ground water and storm water takingFrom the day the record is required to be createdhigh
#R021operationalreportingmandatoryPumping test completion filing windowotherrequirement30 daysWindow to notify Ministry that pumping test water taking is completeWithin 30 days after the day the person has ceased to engage in the activityhigh
#R022operationalreportingmandatoryLong-term water taking notification threshold (Construction)otherrequirement> 365 daysDuration threshold requiring written notice to municipalities and conservation authorities for construction dewatering projectsApplies if the taking of water is intended to continue for more than 365 days from the proposed start datehigh

D Definitions (0)