Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001corrective_actionhealthmandatoryMedical Officer of Health Notification and Directiondrinking waterA person who, pursuant to section 10 of the Act or otherwise, has an obligation to ensure that water meets a standard set out in Schedule 1, 2 or 3 shall be deemed not to have contravened the obligation if, in circumstances where the water does not meet the standard, the person immediately contacts the medical officer of health and takes such other steps as are directed by the medical officer of health.in circumstances where the water does not meet the standardhigh
#Q002corrective_actionhealthmandatoryCorrective Action Under O. Reg. 170/03drinking waterDespite subsection (1), the owner or operating authority of a drinking water system that provides water that does not meet a standard set out in Schedule 1, 2 or 3 shall be deemed not to have contravened paragraph 1 of subsection 11 (1) of the Act only if the owner or operating authority ensures that the appropriate corrective action is taken under Schedule 17 or 18 to Ontario Regulation 170/03 (Drinking Water Systems).provides water that does not meet a standard set out in Schedule 1, 2 or 3high
#Q003operationalhealthguidanceShort-Term Tolerance for Radionuclide Exceedancesdrinking waterRadionuclide concentrations that exceed the standard may be tolerated for a short period, as long as the annual average concentrations remain below the standard and the restriction (see immediately below) for multiple radionuclides is met.as long as the annual average concentrations remain below the standard and the restriction (see immediately below) for multiple radionuclides is methigh
#Q004administrativeoperationalmandatoryLandfilling Site OwnershipotherThe holder of an environmental compliance approval to which a landfilling site is subject must own the entire site in fee simple, unless the site is on Crown land.unless the site is on Crown landhigh
#Q005administrativereportingmandatoryIdentity Change NotificationotherThe holder of an environmental compliance approval or the applicant for an environmental compliance approval to which a landfilling site is or will be subject shall notify the Director in writing within 30 days after any change in his, her or its identity or status or any change in ownership of the site or ownership of property rights in the contaminant attenuation zone.within 30 days after any change in identity, status, or ownershiphigh
#Q006prohibitionoperationalmandatoryMunicipal Waste Burning ProhibitionotherThe owner and the operator of a landfilling site shall ensure that no municipal waste is burned at the site as part of the landfilling operation.does not apply to clean wood and brush burned during daylight hours under controlled conditionshigh
#Q007prohibitionoperationalmandatoryScavenging ProhibitionotherThe owner and the operator of a landfilling site shall ensure that there is no scavenging at the site.high
#Q008operationaloperationalmandatoryDaily Cover RequirementotherThe owner and the operator of a landfilling site shall ensure that all waste accepted for disposal at the site is disposed of in the waste fill zone and is covered at the end of each working day by daily cover in accordance with this section.excludes sites associated with specific forest products operationshigh
#Q009administrativeoperationalmandatoryContingency Plan Financial AssuranceotherThe owner and the operator of a landfilling site shall ensure that financial assurance is provided for the contingency plans for the site, including the construction, operation, maintenance and replacement of works required by the contingency plans.does not apply to sites owned by a municipality, the Crown, or specific forest products companieshigh
#Q010administrativeoperationalmandatoryContaminant Attenuation Zone OwnershipotherIf a contaminant attenuation zone is necessary for proper operation of a landfilling site, the holder of an environmental compliance approval to which the landfilling site is subject must own property rights respecting the contaminant attenuation zoneunless on Crown land or public road with written agreementhigh
#Q011designoperationalmandatoryDesign Specifications ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared in accordance with this section.high
#Q012designoperationalmandatoryBuffer Area RequirementotherThe owner and the operator of a landfilling site shall ensure that the waste fill area is completely surrounded by buffer area in accordance with this section.Minimum 100 metres wide unless specific study justifies 30 metreshigh
#Q013administrativeoperationalmandatoryClosure Financial AssuranceotherThe owner and the operator of a landfilling site shall ensure that financial assurance for the closure of the site and the post-closure care of the site is provided in accordance with this section.Does not apply to sites owned by a municipality or the Crownhigh
#Q014reportingoperationalmandatorySite Preparation ReportotherA person shall not place any waste in a newly constructed base or base side slope area of a landfilling site until a written report has been prepared documenting all construction, quality assurance and quality control activities and confirming that the site conditions and details of the construction of the new area are in accordance with the design plans and specifications of the landfilling site.high
#Q015reportingreportingmandatoryDaily Record KeepingotherThe owner and the operator of a landfilling site shall ensure that daily records of site operations are made during the operation of the site and that the records are retained for at least two years after they are made.high
#Q016reportingreportingmandatoryAnnual Operations ReportotherThe owner and the operator of a landfilling site shall ensure that, (a) within three months after each anniversary of the date on which waste was first accepted at the site, an annual report is prepared respecting the operation of the landfilling site, including a summary of results from monitoring programs; and (b) all of the reports are retained until at least two years after the site is closed.high
#Q017monitoringoperationalmandatorySurface Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring the quality and quantity of the surface water features on the site and of the surface water features that receive a direct discharge from the site.high
#Q018corrective_actionoperationalmandatoryInvestigative Activities for Trigger ExceedanceotherThe owner and the operator of the landfilling site shall ensure that investigative activities are carried out with respect to the cause of an increase in contaminant concentrations if any of the trigger criteria described under paragraph 5 of subsection 12 (2), as they may have been modified under paragraph 2 of subsection (3) of this section, is exceeded for any single monitoring event.when trigger criteria are exceededhigh
#Q019operationaloperationalmandatoryFinal Cover InstallationotherThe owner and the operator of a landfilling site shall ensure that the following materials are applied to the waste fill zone as final cover, from bottom to top: 1. A minimum of 0.6 metres of cover material. 2. A minimum of 0.15 metres of topsoil or other material approved by the Director as able to sustain plant growth. 3. A vegetative cover consisting of vegetation that is suited to local conditions and that is capable with minimal care of providing vigorous, plentiful cover not later than its third growing season.high
#Q020reportingoperationalmandatoryClosure ReportotherThe owner and the operator of a landfilling site shall ensure that a written report on activities for the closure of the site, activities for the post-closure care of the site and the proposed end use of the site is prepared not later than the date 90 per cent of the total waste disposal volume is reached or two years before the anticipated date of closure, whichever comes first.high
#Q021monitoringoperationalmandatoryGround Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring ground water quality and quantity.high
#Q022monitoringoperationalmandatoryLeachate Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring leachate quality and quantity.high
#Q023reportingreportingmandatoryAnnual Post-Closure Care ReportotherThe owner and the operator of a landfilling site shall ensure that, within three months after each anniversary of the date on which waste was last placed on the site, an annual report is prepared respecting the post-closure care of the landfilling site, including a summary of results from monitoring programs.high
#Q024administrativeoperationalmandatoryContaminating Life Span Property RightsotherThe holder of the environmental compliance approval must continue to own the property rights for all of the contaminating life span of the site.high
#Q025designoperationalmandatoryFinal Slope Gradient RequirementotherThe owner and the operator of a landfilling site shall ensure that the final slopes above grade within the waste fill zone at the time of site closure do not exceed one unit vertical to four units horizontal and are not less than one unit vertical to 20 units horizontal.does not apply if a written report confirms alternative design for final slopes is acceptablehigh
#Q026corrective_actionoperationalmandatoryContingency Measure ImplementationotherIf the monitoring results, investigative activities and implementation criteria indicate the need to implement contingency measures, the owner and the operator of a landfilling site shall ensure that the following steps are taken: 1. The Director must be notified of the need to implement contingency measures. 2. Detailed plans, specifications and descriptions for the design, operation and maintenance of the contingency measures must be prepared. 3. The contingency measures must be implemented.if monitoring results indicate the need to implement contingency measureshigh
#Q027administrativeoperationalmandatoryFinancial Assurance Annual UpdateotherThe amount of financial assurance provided shall be updated annually or as otherwise required by the Director.high
#Q028designoperationalmandatoryGround Water Protection Design ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report describing the design for the ground water protection features of the site has been prepared in accordance with this section.high
#Q029administrativeoperationalmandatoryContaminant Attenuation Zone Property Rights ContentotherThe ownership of the property rights must include the right to, (a) discharge contaminants from the landfilling site into the contaminant attenuation zone; (b) enter into the contaminant attenuation zone and onto the surface above the contaminant attenuation zone for purposes of testing, monitoring, intercepting contaminants and carrying out remedial work; (c) install, operate and maintain works, for the purposes mentioned in clause (b), in or above the contaminant attenuation zone, including on the surface above the contaminant attenuation zone; and (d) prevent the owner of the land in which the contaminant attenuation zone is located from paving, erecting a structure or making any use of land above or in the vicinity of the contaminant attenuation zone that would interfere with the functioning of the contaminant attenuation zone or with the exercise of any of the rights mentioned in this subsection.high
#Q030designoperationalmandatoryHydrogeological Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the geologic and hydrogeologic conditions of the site and ground water protection for the site has been prepared in accordance with this section.high
#Q031designoperationalmandatorySurface Water Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the surface water conditions of the site and surface water protection for the site has been prepared in accordance with this section.high
#Q032designoperationalmandatoryLeachate Disposal ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the management and disposal of any leachate collected at the site has been prepared.high
#Q033designoperationalmandatoryLeachate Contingency Plans ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for a leachate contingency plan for the site has been prepared in accordance with this section.high
#Q034designoperationalmandatorySurface Water Control ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the control, treatment and discharge of surface water at the site during construction, site operation and following closure has been prepared in accordance with this section.high
#Q035designoperationalmandatorySubsurface Migration of Landfill Gas ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared in accordance with this section that contains the following: 1. An assessment of the potential for the migration of landfill gas in the subsurface. 2. Plans, specifications and descriptions for the monitoring, control, collection, use or discharge of landfill gas at the site if, on the basis of the assessment, any of these actions are necessary.high
#Q036operationaloperationalmandatorySubsurface Migration Methane Gas ControlotherThe design of the site and any plans, specifications and descriptions for the control of landfill gas must ensure that the subsurface migration of landfill gas meets the following conditions: 1. The concentration of methane gas below the surface of the land at the boundary of the site must be less than 2.5 per cent by volume. 2. The concentration of methane gas must be less than 1.0 per cent by volume in any on-site building or enclosed structure... 4. The concentration of methane gas from the site must be less than 0.05 per cent by volume in any off-site building or enclosed structure...does not apply to leachate or gas collection facilities with specific health and safety measureshigh
#Q037designoperationalmandatoryAtmospheric Emissions of Landfill Gas ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared respecting the design, operation, maintenance and monitoring of facilities for the collection, and for the burning or use, of landfill gas generated by the site during site operation and following site closure.applies to sites > 1.5 million cubic metres; excludes coal ash sites and specific forest product siteshigh
#Q038designoperationalmandatoryOperation and Maintenance Procedures ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a writ ten report has been prepared containing plans, specifications and descriptions of the operation, maintenance, monitoring, closure and post-closure care of the site, including matters related to record keeping, reporting and financial assurance.high
#Q039administrativeoperationalmandatoryFinancial Assurance Replacement (Contingency)otherThe owner and the operator of a landfilling site shall ensure that any amount of financial assurance used by the Director under subsection (6) is replaced within six months after it is used unless the Director directs otherwise.high
#Q040administrativeoperationalmandatoryFinancial Assurance Replacement (Closure)otherThe owner and the operator of a landfilling site shall ensure that any amount of the financial assurance used by the Director under subsection (10) is replaced within six months after it is used unless the Director directs otherwise.high
#Q041administrativeoperationalmandatoryClosure Financial Assurance UpdateotherThe estimation of costs and the amount of the financial assurance provided shall be updated annually or as otherwise required by the Director.Applicable to financial assurance for site closure and post-closure carehigh
#Q042corrective_actionoperationalmandatoryTrigger Criteria Investigation and Revision StepsotherThe owner and the operator of the landfilling site shall ensure that the steps described in subsection (3) [including reviewing contingency measures, trigger criteria, and monitoring programs] are taken if the investigative activities indicate that the potential exists for a liner/leachate system to fail or for leachate to exceed expected quantities or qualities.Triggered if investigative activities indicate potential failures or exceedanceshigh
#Q043designoperationalmandatoryFinal Cover Design ObjectivesotherThe owner and the operator of a landfilling site shall ensure that the final cover is designed so that the infiltration rate is in accordance with the site design, existing or anticipated gas control facilities are accommodated, and end-use requirements are met.high
#Q044designoperationalmandatorySurface Water Discharge and Background ProtectionotherThe plans, specifications and descriptions must ensure that the concentration of any contaminant in surface water being discharged from the site to a waterbody is in accordance with Ministry of Environment and Energy Guideline B - 1 and Procedure B - 1 - 1, and that background levels for dissolved oxygen, turbidity, temperature, and the hydrologic cycle are not adversely affected.Applicable to site design and surface water control systemshigh
#Q045monitoringoperationalmandatoryPrimary Leachate Pipe InspectionotherLeachate collection pipes must be inspected at least annually for the first five years after placement of waste overtop of each pipe and then as often as future inspections indicate to be necessary.First five years after waste placement over pipehigh
#Q046operationaloperationalmandatoryPrimary Leachate Pipe CleaningotherLeachate collection pipes must be cleaned whenever an inspection indicates that cleaning is necessary.high
#Q047operationaloperationalmandatoryPrimary Leachate Obstruction RemovalotherLeachate must be removed from the collection system in order to avoid obstructions to leachate flows within the system.high
#Q048monitoringoperationalmandatorySecondary Leachate Pipe InspectionotherLeachate collection pipes must be inspected at least annually for the first five years after the initial production of leachate from the secondary leachate collection system and then as often as future inspections indicate to be necessary.First five years after initial production of leachatehigh
#Q049operationaloperationalmandatorySecondary Leachate Pipe CleaningotherLeachate collection pipes must be cleaned whenever an inspection indicates that cleaning is necessary.high
#Q050operationaloperationalmandatorySecondary Leachate Obstruction RemovalotherLeachate must be removed from the collection system in order to avoid obstructions to leachate flows within the system.high
#Q051operationaloperationalmandatoryGeomembrane Puncture ProtectionotherThe geomembrane must be protected against puncturing and load-induced damage at all times, including during installation.high
#Q052operationaloperationalmandatoryGeomembrane Installation StandardsotherDuring installation, care must be taken to, i. remove wrinkles in the geomembrane, ii. minimize stress concentration, iii. ensure high quality seams, iv. minimize differential settlement, v. minimize exposure to ultraviolet light, vi. prevent damage due to sliding, vii. prevent damage due to installation in cold conditions, and viii. prevent damage due to rodents.high
#Q053operationaloperationalmandatoryClayey Liner Installation StandardsotherDuring installation, care must be taken to, i. control soil properties and water content, ii. ensure the breakup of clods, iii. control lift thickness and compaction, iv. remove stones larger than 100 millimetres, v. prevent desiccation of the compacted clayey liner, vi. prevent damage to the compacted clayey liner due to freezing, vii. prevent damage to the compacted clayey liner from vehicular traffic, viii. prevent damage to the compacted clayey liner due to rodents, and ix. prevent damage to the compacted clayey liner due to differential settlement.high
#Q054reportingoperationalmandatoryGeotechnical Engineer Liner ConfirmationotherThe report of a suitably qualified geotechnical engineer must confirm that there is no evident cracking in the constructed liner or significant occurrence of clods, stones, branches or other material that could shorten the service life of the constructed liner or significantly increase the hydraulic conductivity.high

P Quantitative Requirements (90)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001microbiologicalhealthmandatoryEscherichia coli (E. coli)drinking waterMAC0 detectableStandard (expressed as a maximum)Not detectablehigh
#P002microbiologicalhealthmandatoryTotal coliformsdrinking waterMAC0 detectableStandard (expressed as a maximum)Not detectablehigh
#P003chemicalhealthmandatoryAlachlordrinking waterMAC0.005 mg/Lhigh
#P004chemicalhealthmandatoryAntimonydrinking waterMAC0.006 mg/Lhigh
#P005chemicalhealthmandatoryArsenicdrinking waterMAC0.01 mg/Lhigh
#P006chemicalhealthmandatoryAtrazine + N-dealkylated metabolitesdrinking waterMAC0.005 mg/Lhigh
#P007chemicalhealthmandatoryAzinphos-methyldrinking waterMAC0.02 mg/Lhigh
#P008chemicalhealthmandatoryBariumdrinking waterMAC1.0 mg/Lhigh
#P009chemicalhealthmandatoryBenzenedrinking waterMAC0.001 mg/Lhigh
#P010chemicalhealthmandatoryBenzo(a)pyrenedrinking waterMAC0.00001 mg/Lhigh
#P011chemicalhealthmandatoryBorondrinking waterMAC5.0 mg/Lhigh
#P012chemicalhealthmandatoryBromatedrinking waterMAC0.01 mg/Lhigh
#P013chemicalhealthmandatoryBromoxynildrinking waterMAC0.005 mg/Lhigh
#P014chemicalhealthmandatoryCadmiumdrinking waterMAC0.005 mg/Lhigh
#P015chemicalhealthmandatoryCarbaryldrinking waterMAC0.09 mg/Lhigh
#P016chemicalhealthmandatoryCarbofurandrinking waterMAC0.09 mg/Lhigh
#P017chemicalhealthmandatoryCarbon Tetrachloridedrinking waterMAC0.002 mg/Lhigh
#P018chemicalhealthmandatoryChloraminesdrinking waterMAC3.0 mg/Lhigh
#P019chemicalhealthmandatoryChloratedrinking waterMAC1.0 mg/Lhigh
#P020chemicalhealthmandatoryChloritedrinking waterMAC1.0 mg/Lhigh
#P021chemicalhealthmandatoryChlorpyrifosdrinking waterMAC0.09 mg/Lhigh
#P022chemicalhealthmandatoryChromiumdrinking waterMAC0.05 mg/Lhigh
#P023chemicalhealthmandatoryCyanidedrinking waterMAC0.2 mg/Lhigh
#P024chemicalhealthmandatoryDiazinondrinking waterMAC0.02 mg/Lhigh
#P025chemicalhealthmandatoryDicambadrinking waterMAC0.12 mg/Lhigh
#P026chemicalhealthmandatory1,2-Dichlorobenzenedrinking waterMAC0.2 mg/Lhigh
#P027chemicalhealthmandatory1,4-Dichlorobenzenedrinking waterMAC0.005 mg/Lhigh
#P028chemicalhealthmandatory1,2-Dichloroethanedrinking waterMAC0.005 mg/Lhigh
#P029chemicalhealthmandatory1,1-Dichloroethylene (vinylidene chloride)drinking waterMAC0.014 mg/Lhigh
#P030chemicalhealthmandatoryDichloromethanedrinking waterMAC0.05 mg/Lhigh
#P031chemicalhealthmandatory2,4-Dichlorophenoldrinking waterMAC0.9 mg/Lhigh
#P032chemicalhealthmandatory2,4-Dichlorophenoxy acetic acid (2,4-D)drinking waterMAC0.1 mg/Lhigh
#P033chemicalhealthmandatoryDiclofop-methyldrinking waterMAC0.009 mg/Lhigh
#P034chemicalhealthmandatoryDimethoatedrinking waterMAC0.02 mg/Lhigh
#P035chemicalhealthmandatoryDioxin and Furandrinking waterMAC0.000000015 mg/Lhigh
#P036chemicalhealthmandatoryDiquatdrinking waterMAC0.07 mg/Lhigh
#P037chemicalhealthmandatoryDiurondrinking waterMAC0.15 mg/Lhigh
#P038chemicalhealthmandatoryEthylbenzenedrinking waterMAC0.14 mg/Lhigh
#P039chemicalhealthmandatoryFluoridedrinking waterMAC1.5 mg/Lhigh
#P040chemicalhealthmandatoryGlyphosatedrinking waterMAC0.28 mg/Lhigh
#P041chemicalhealthmandatoryHaloacetic acidsdrinking waterMAC0.08 mg/Lhigh
#P042chemicalhealthmandatoryLeaddrinking waterMAC0.010 mg/Lhigh
#P043radiologicalhealthmandatoryMultiple radionuclidesdrinking waterrequirement<= 1 quotient sumRestriction for multiple radionuclidesif two or more radionuclides are presenthigh
#P044operationaloperationalmandatoryConstruction Commencement Timeframeotherrequirement<= 6 monthsSubsection (1) does not apply unless the construction is commenced within six months after the permit is issued.Construction must commence within six months after permit issuance for transition provisions to apply.high
#P045operationaloperationalmandatoryTransition Permit Issuance Deadlineotherrequirement<= 2024-12-31 dateSubject to subsection (2), O. Reg. 332/12 continues for construction for which a permit was issued by this date.Construction must commence within six months of permit issuance.high
#P046operationaloperationalmandatoryTransition Drawings Completion Deadlineotherrequirement<= 2024-12-31 dateSubject to subsection (2), O. Reg. 332/12 continues for construction where drawings were substantially completed by this date.Construction must commence within six months of permit issuance and permit application must meet deadline.high
#P047operationaloperationalmandatoryTransition Permit Application Deadlineotherrequirement<= 2025-03-31 dateFor construction with drawings completed by Dec 31, 2024, the permit application must be made by this date to follow the old regulation.Construction must commence within six months of permit issuance.high
#P048chemicaloperationalmandatoryTotal Alkalinity (Pools/Spas)recreational waterrequirement60-180 ppmMaintained in every part of the pool or spa at all times during the daily use periodhigh
#P049chemicaloperationalmandatorypH Value (Pools/Spas)recreational waterrequirement7.2-7.8 pH unitsMaintained in every part of the pool or spa at all times during the daily use periodhigh
#P050chemicalhealthmandatoryFree Available Chlorine (Public Pool)recreational waterrequirement0.5-10 ppmExcluding public floatation pools or public cold plunge poolshigh
#P051chemicalhealthmandatoryFree Available Chlorine/Total Bromine (Public Spa)recreational waterrequirement5-10 ppmResidual maintained in every part of a public spahigh
#P052chemicalhealthmandatoryFree Available Chlorine (Floatation/Cold Plunge)recreational waterrequirement5-10 ppmResidual maintained in every part of the public floatation or cold plunge poolhigh
#P053chemicalhealthmandatoryCyanuric Acid Concentrationrecreational waterMAC<= 60 mg/LWhere cyanurate stabilization is maintained in outdoor poolshigh
#P054physicaltreatmentmandatoryOxidation Reduction Potential (ORP)recreational waterrequirement600-900 mVApplies if the pool or spa is equipped with an automatic sensing devicehigh
#P055physicalhealthmandatoryMaximum Spa Water Temperaturerecreational waterMAC<= 40 degrees CelsiusRegulated by tamper-proof upper limit cut-off switchhigh
#P056physicalaestheticmandatoryWater Clarity (Black Disc Visibility)recreational waterrequirement9 metres150mm black disc on white background at deepest point must be clearly visible from the deckNot applicable to modified or wave action poolshigh
#P057operationaltreatmentmandatoryMake-up Water Volume (Pools)recreational waterrequirement>= 15 litres per batherAdded during each operating day as determined by a water meterhigh
#P058designtreatmentmandatoryWater Turnover Rate (Class A Pool)recreational waterrequirement>= 4 times total capacity per dayApplies to Class A pools constructed after April 30, 1974high
#P059physicalhealthmandatoryPublic Cold Plunge Pool Temperaturerecreational waterMAC<= 15 degrees CelsiusDefinition of public cold plunge pool temperature requirementhigh
#P060designtreatmentmandatoryWater Turnover Rate (Class B and pre-1974 Class A)recreational waterrequirement>= 3 times total capacity per dayApplies to Class A pools constructed before May 1, 1974 and all Class B poolshigh
#P061designtreatmentmandatoryWater Turnover Rate (Wave Action Pool)recreational waterrequirement>= 6 times total capacity per dayContinuous operation requiredhigh
#P062chemicalhealthmandatoryTotal Bromine Residual (Non-Wave Pool)recreational waterrequirement2-8 ppmWhere a bromine compound is used in a pool that is not a wave action poolhigh
#P063chemicalhealthmandatoryTotal Bromine Residual (Wave Action Pool)recreational waterrequirement3-10 ppmWhere a bromine compound is used in a wave action poolhigh
#P064operationaltreatmentmandatoryMake-up Water Volume (Public Spa > 4000L)recreational waterrequirement>= 15 litres per bather useTo a maximum of 20 per cent of the total spa volume dailyApplies to spas with a volume exceeding 4,000 litreshigh
#P065operationalhealthmandatoryStandard Maximum Bather Load Formularecreational waterrequirementD/2.5 + S/1.4 bathersD = area deeper than 1.35m; S = area 1.35m or shallowerNot applicable to wave action poolshigh
#P066designoperationalmandatoryReaching Pole Lengthrecreational waterrequirement>= 3.65 metresElectrically insulated or non-conducting reaching polehigh
#P067designoperationalmandatoryBuoyant Throwing Aid Rope Lengthrecreational waterrequirement>= (W/2 + 3) metresW = width of pool; 6mm diameter ropehigh
#P068operationalhealthmandatorySpa Timing Device Limitrecreational waterrequirement<= 15 minutesControls the period of operation of the jet pumphigh
#P069chemicalhealthmandatoryPublic Floatation Tank Free Chlorinerecreational waterrequirement1.5-5 ppmResidual of free available chlorine in every part of the floatation tankIf bromine is used, the range is 2.5 ppm to 5 ppmhigh
#P070chemicalaestheticguidelineMineralized Water (Total Dissolved Solids)drinking water, agricultural waterrequirement> 6000 mg/LDefinition of mineralized waterTDS exceeds this thresholdhigh
#P071physicaloperationalmandatorySealant Bentonite Solids Contentdrinking water, otherrequirement>= 20 % bentonite solids by weightDefinition of sealant slurryhigh
#P072designoperationalmandatoryShallow Works Depth Limitotherrequirement<= 3.0 metresExemption depth for test holes or dewatering wellsDepth below ground surfacehigh
#P073chemicalhealthmandatoryDisinfection Free Chlorine Concentrationdrinking watertreatment_goal50-200 mg/LWater in the well must be dosed to this concentration of free chlorineOn completion of structural stage or pump installationhigh
#P074designoperationalmandatoryCasing Height Above Grounddrinking waterrequirement>= 40 centimetresCasing height above the highest point on the ground surfaceMeasured within 3 metres radially from the outside of the casinghigh
#P075designoperationalmandatoryMinimum Casing Depthdrinking waterrequirement>= 6 metresMinimum depth of casing below original ground surfaceUnless a depth of 6m would not permit use of the only useful aquifer (then min 2.5m)high
#P076operationalreportingmandatoryWell Record Delivery Timeframedrinking water, otherrequirement<= 14 daysDelivery of well record copy to well purchaser and ownerAfter the date on which the well's structural stage is completehigh
#P077designoperationalmandatorySteel Casing Nominal Wall Thickness (Large ID)drinking waterrequirement4.78 millimetresSteel casing with an inside diameter of more than 50.8 mmMinimum wall thickness 4.18 mmhigh
#P078operationaloperationalmandatoryWell Contractor Liability Insurance (Per Occurrence)otherrequirement>= 2000000 CADThird party general liability insurance limit per occurrenceRequired condition for well contractor licencehigh
#P079operationaloperationalmandatoryTechnician Training Course Durationotherrequirement>= 30 hoursSuccessful completion of an approved course of study for classes 1, 2, 3, or 4Application for well technician licencehigh
#P080chemicalaestheticmandatoryMineralized Water (Chlorides)drinking water, agricultural waterrequirement500 mg/LDefinition of mineralized waterChloride concentration exceeding this valuehigh
#P081chemicalaestheticmandatoryMineralized Water (Sulphates)drinking water, agricultural waterrequirement500 mg/LDefinition of mineralized waterSulphate concentration exceeding this valuehigh
#P082physicaloperationalmandatoryBentonite Sodium Montmorillonite Contentotherrequirement> 50 % sodium montmorillonite by weightDefinition of bentonite sealing materialhigh
#P083operationaloperationalmandatoryWell Contractor Liability Insurance (Annual Aggregate)otherrequirement>= 5000000 CADAnnual aggregate limit for third party general liability insuranceCondition of every well contractor licencehigh
#P084operationaloperationalmandatoryWell Technician Minimum Ageotherrequirement>= 18 yearsRequirement for applicant for well technician licencehigh
#P085operationaloperationalmandatoryContinuing Education Requirement (Classes 1-4)otherrequirement>= 21 hoursTotal hours of instruction required for licence renewalDuring the period preceding licence expiryhigh
#P086designoperationalmandatoryWell Pit Floor Sealant Thicknessotherrequirement>= 10 centimetresLayer of suitable sealant on the floor of a permitted well pitMust be capable of supporting a person when sethigh
#P087designhealthmandatoryDrilled Well Separation Distanceotherrequirement>= 15 metresMinimum separation from a source of contaminants for a drilled well with >6m casingApplies to new drilled wells with deep casinghigh
#P088designoperationalmandatorySteel Casing Nominal Wall Thickness (Small ID)drinking waterrequirement2.77 millimetresSteel casing with an inside diameter of 50.8 mm or lessMinimum wall thickness of 2.41 mm requiredhigh
#P089operationalreportingmandatoryWell Yield Test Pumping Durationotherrequirement>= 1 hourMinimum continuous pumping time at a steady rateDuring yield testing before structural stage completionhigh
#P090designoperationalmandatoryAbandonment Surface Seal Thicknessotherrequirement50-150 centimetresVertical thickness of bentonite chips, pellets, or granulesPlaced in the well opening to seal at ground surface during abandonmenthigh