Parameter Viewer

Document ID ca-on-or1bc-2026-04-21 Title O. Reg. 163/24: BUILDING CODE URL https://www.ontario.ca/laws/regulation/240163 Jurisdiction /ca/on Subdomain(s) none Language Status completed Analyzed at 2026-05-12 03:57:06.643907+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (47)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeoperationalmandatoryAdoption of Building CodeotherThe code issued by the Canadian Commission on Building and Fire Codes, part of National Research Council Canada, known as CCBFC NRCC-CONST-56435E, “National Building Code of Canada 2020”, (First Printing), as amended by the document entitled “Ontario Amendments to the National Building Code of Canada 2020”, dated April 21, 2026 and issued by the Ministry of Municipal Affairs and Housing, are together adopted as the building code.high
#Q002administrativeoperationalmandatoryTransition Provisions for Previous Building CodeotherSubject to subsection (2), Ontario Regulation 332/12 (Building Code) made under the Act, as it read on December 31, 2024, is deemed to continue in force with respect to construction, (a) for which a permit has been issued on or before December 31, 2024; or (b) for which the working drawings, plans and specifications are substantially completed on or before December 31, 2024, and for which an application for a permit is made on or before March 31, 2025 under that regulation, as it read on December 31, 2024.Only applicable if construction commences within the required timeframe after permit issuance.high
#Q003operationaloperationalmandatoryConstruction Commencement Timeframe for Transition ApplicabilityotherSubsection (1) does not apply unless the construction is commenced within six months after the permit is issued.Applies when utilizing the transition provisions under subsection 2(1) maintaining Ontario Regulation 332/12.high
#Q004administrativeoperationalmandatoryLandfill Site OwnershipotherThe holder of an environmental compliance approval to which a landfilling site is subject must own the entire site in fee simple, unless the site is on Crown land.high
#Q005reportingreportingmandatoryNotification of Identity or Ownership ChangesotherThe holder of an environmental compliance approval or the applicant for an environmental compliance approval to which a landfilling site is or will be subject shall notify the Director in writing within 30 days after any change in his, her or its identity or status or any change in ownership of the site or ownership of property rights in the contaminant attenuation zone.high
#Q006designoperationalmandatoryDesign Specifications Report RequirementotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared in accordance with this section.high
#Q007operationaloperationalmandatorySite Preparation Report RequirementotherA person shall not place any waste in a newly constructed base or base side slope area of a landfilling site until a written report has been prepared documenting all construction, quality assurance and quality control activities and confirming that the site conditions and details of the construction of the new area are in accordance with the design plans and specifications of the landfilling site.high
#Q008administrativereportingmandatoryDaily Record KeepingotherThe owner and the operator of a landfilling site shall ensure that daily records of site operations are made during the operation of the site and that the records are retained for at least two years after they are made.high
#Q009prohibitionhealthmandatoryBurning ProhibitionotherThe owner and the operator of a landfilling site shall ensure that no municipal waste is burned at the site as part of the landfilling operation.Does not apply to clean wood and brush burned during daylight hours under controlled conditions.high
#Q010prohibitionoperationalmandatoryScavenging ProhibitionotherThe owner and the operator of a landfilling site shall ensure that there is no scavenging at the site.high
#Q011operationalaestheticmandatoryDaily Cover RequirementotherThe owner and the operator of a landfilling site shall ensure that all waste accepted for disposal at the site is disposed of in the waste fill zone and is covered at the end of each working day by daily cover in accordance with this section.high
#Q012administrativeoperationalmandatoryContaminant Attenuation Zone Rights OwnershipotherIf a contaminant attenuation zone is necessary for proper operation of a landfilling site, the holder of an environmental compliance approval to which the landfilling site is subject must own property rights respecting the contaminant attenuation zone, unless, (a) the contaminant attenuation zone is on Crown land and the Crown has agreed in writing to the use of the land for that purpose; or (b) the contaminant attenuation zone is on a public road and the road authority has agreed in writing to the use of the land for that purpose.If a contaminant attenuation zone is necessary for site operation.high
#Q013designaestheticmandatoryWaste Fill Area Buffer AreaotherThe owner and the operator of a landfilling site shall ensure that the waste fill area is completely surrounded by buffer area in accordance with this section.high
#Q014reportingreportingmandatoryAnnual Operations Report PreparationotherThe owner and the operator of a landfilling site shall ensure that, (a) within three months after each anniversary of the date on which waste was first accepted at the site, an annual report is prepared respecting the operation of the landfilling site, including a summary of results from monitoring programs; and (b) all of the reports are retained until at least two years after the site is closed.high
#Q015monitoringoperationalmandatorySurface Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring the quality and quantity of the surface water features on the site and of the surface water features that receive a direct discharge from the site.high
#Q016monitoringoperationalmandatoryGround Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring ground water quality and quantity.high
#Q017reportingreportingmandatoryClosure Report PreparationotherThe owner and the operator of a landfilling site shall ensure that a written report on activities for the closure of the site, activities for the post-closure care of the site and the proposed end use of the site is prepared not later than the date 90 per cent of the total waste disposal volume is reached or two years before the anticipated date of closure, whichever comes first.high
#Q018reportingtreatmentmandatoryLeachate Disposal ReportwastewaterA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the management and disposal of any leachate collected at the site has been prepared.high
#Q019designoperationalmandatorySubsurface Migration of Landfill Gas ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared... that contains... 1. An assessment of the potential for the migration of landfill gas in the subsurface. 2. Plans... for the monitoring, control, collection, use or discharge of landfill gas at the site if... necessary.high
#Q020designoperationalmandatoryAtmospheric Emissions of Landfill Gas ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared respecting the design, operation, maintenance and monitoring of facilities for the collection, and for the burning or use, of landfill gas generated by the site during site operation and following site closure.Applies if volume > 1.5 million cubic metres unless exempt.high
#Q021administrativereportingmandatoryFinancial Assurance for Contingency PlansotherThe owner and the operator of a landfilling site shall ensure that financial assurance is provided for the contingency plans for the site, including the construction, operation, maintenance and replacement of works required by the contingency plans.Does not apply to municipalities or the Crown.high
#Q022administrativereportingmandatoryFinancial Assurance for Closure and Post-Closure CareotherThe owner and the operator of a landfilling site shall ensure that financial assurance for the closure of the site and the post-closure care of the site is provided in accordance with this section.Does not apply to municipalities or the Crown.high
#Q023monitoringoperationalmandatoryLeachate Monitoring ProgramwastewaterThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring leachate quality and quantity.high
#Q024corrective_actionoperationalmandatoryLeachate Contingency Investigative ActivitieswastewaterThe owner and the operator of the landfilling site shall ensure that investigative activities are carried out with respect to the cause of an increase in contaminant concentrations if any of the trigger criteria described under paragraph 5 of subsection 12 (2)... is exceeded for any single monitoring event.high
#Q025operationaloperationalmandatoryFinal Cover Material StandardsotherThe owner and the operator of a landfilling site shall ensure that the following materials are applied to the waste fill zone as final cover, from bottom to top: 1. A minimum of 0.6 metres of cover material. 2. A minimum of 0.15 metres of topsoil or other material approved by the Director... 3. A vegetative cover...high
#Q026designoperationalmandatoryFinal Slopes Gradient RequirementsotherThe owner and the operator of a landfilling site shall ensure that the final slopes above grade within the waste fill zone at the time of site closure do not exceed one unit vertical to four units horizontal and are not less than one unit vertical to 20 units horizontal.high
#Q027reportingreportingmandatoryAnnual Post-Closure Care ReportotherThe owner and the operator of a landfilling site shall ensure that, within three months after each anniversary of the date on which waste was last placed on the site, an annual report is prepared respecting the post-closure care of the landfilling site, including a summary of results from monitoring programs.high
#Q028designoperationalmandatoryHydrogeological Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the geologic and hydrogeologic conditions of the site and ground water protection for the site has been prepared in accordance with this section.high
#Q029designoperationalmandatorySurface Water Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the surface water conditions of the site and surface water protection for the site has been prepared in accordance with this section.high
#Q030designoperationalmandatoryGround Water Protection Features Design ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report describing the design for the ground water protection features of the site has been prepared in accordance with this section.high
#Q031designoperationalmandatoryLeachate Contingency Plan ReportwastewaterA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for a leachate contingency plan for the site has been prepared in accordance with this section.high
#Q032designoperationalmandatorySurface Water Control ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the control, treatment and discharge of surface water at the site during construction, site operation and following closure has been prepared in accordance with this section.high
#Q033designoperationalmandatoryOperation and Maintenance Procedures ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared containing plans, specifications and descriptions of the operation, maintenance, monitoring, closure and post-closure care of the site, including matters related to record keeping, reporting and financial assurance.high
#Q034corrective_actionoperationalmandatoryImplementation of Contingency MeasuresotherIf the monitoring results, investigative activities and implementation criteria indicate the need to implement contingency measures, the owner and the operator of a landfilling site shall ensure that the following steps are taken: 1. The Director must be notified of the need to implement contingency measures. 2. Detailed plans, specifications and descriptions for the design, operation and maintenance of the contingency measures must be prepared. 3. The contingency measures must be implemented.Applicable when investigative activities indicate risks to liners or collection systems.high
#Q035monitoringoperationalmandatoryLeachate Collection Pipe InspectionwastewaterLeachate collection pipes must be inspected at least annually for the first five years after placement of waste overtop of each pipe and then as often as future inspections indicate to be necessary.Condition for assuming 100-year, 75-year, or 60-year service life.high
#Q036operationaloperationalmandatoryLeachate Collection Pipe CleaningwastewaterLeachate collection pipes must be cleaned whenever an inspection indicates that cleaning is necessary.Condition for assuming 100-year, 75-year, or 60-year service life.high
#Q037operationaloperationalmandatoryLeachate Removal RequirementwastewaterLeachate must be removed from the collection system in order to avoid obstructions to leachate flows within the system.Condition for assuming 100-year, 75-year, or 60-year service life.high
#Q038administrativeoperationalmandatoryOwnership Duration for Contaminant Attenuation ZoneotherThe holder of the environmental compliance approval must continue to own the property rights for all of the contaminating life span of the site.Applies to property rights in a contaminant attenuation zone.high
#Q039designhealthmandatoryLandfill Gas Methane Concentration Design CriteriaotherThe design of the site and any plans, specifications and descriptions for the control of landfill gas must ensure that the subsurface migration of landfill gas meets the following conditions: 1. The concentration of methane gas below the surface of the land at the boundary of the site must be less than 2.5 per cent by volume. 2. The concentration of methane gas must be less than 1.0 per cent by volume in any on-site building or enclosed structure... 4. The concentration of methane gas from the site must be less than 0.05 per cent by volume in any off-site building or enclosed structure...Applicable to all building/structure safety designs for landfill gas.high
#Q040monitoringtreatmentmandatoryDaily Cover Toxicity TestingotherWhen tested using the Toxicity Characteristic Leaching Procedure, the daily cover must not produce leachate containing any of the contaminants listed in Schedule 4 to Regulation 347... at a concentration equal to or in excess of the concentration specified in that Schedule for the contaminant.high
#Q041prohibitionoperationalmandatorySludge Deposition RestrictionwastewaterSludge must not be deposited in the waste fill zone in a manner that would allow sludge to move into the leachate collection system and promote biological clogging.Condition for assuming specified service lives for leachate collection systems.high
#Q042administrativereportingmandatoryAnnual Financial Assurance UpdateotherThe amount of financial assurance provided shall be updated annually or as otherwise required by the Director.high
#Q043administrativeoperationalmandatoryReplacement of Used Financial AssuranceotherThe owner and the operator of a landfilling site shall ensure that any amount of financial assurance used by the Director under subsection (6) is replaced within six months after it is used unless the Director directs otherwise.Applies after the Director utilizes financial assurance for site closure or post-closure care expenses.high
#Q044corrective_actionoperationalmandatoryContingency Action StepsotherThe owner and the operator of the landfilling site shall ensure that the steps described in subsection (3) are taken if the investigative activities required by subsection (1) indicate that potential exists for liner/leachate system failure or exceeding contaminant limits.Triggered when investigative activities indicate potential for impact or failure.high
#Q045designoperationalmandatoryFinal Cover Design ObjectivesotherThe owner and the operator of a landfilling site shall ensure that the final cover is designed so that, (a) the infiltration rate through the final cover is in accordance with the design for the site respecting ground water protection prepared under section 10; (b) any existing or anticipated facilities for the control, collection, use or discharge of landfill gas are accommodated; and (c) the requirements for the end use of the site, as described in the site design report prepared under section 6 and the closure report prepared under section 31, are met.high
#Q046operationaloperationalmandatoryGeotechnical Confirmation of Liner IntegrityotherThe report of a suitably qualified geotechnical engineer must confirm that there is no evident cracking in the constructed liner or significant occurrence of clods, stones, branches or other material that could shorten the service life of the constructed liner or significantly increase the hydraulic conductivity.Condition for assuming specified service lives for compacted clayey liners.high
#Q047designtreatmentmandatorySurface Water Protection Design CriteriaotherThe plans, specifications and descriptions must ensure that, (a) the concentration of any contaminant in surface water being discharged from the site to a waterbody is in accordance with Ministry of Environment and Energy Guideline B - 1... and (b) the background levels for dissolved oxygen, turbidity, and temperature, and the hydrologic cycle of any on-site, adjacent or receiving surface water features, are not adversely affected by the site.Applicable to site design for surface water control and discharge.high

P Quantitative Requirements (81)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001chemicaltreatmentmandatoryTotal Alkalinity - Public Pools and Spasrecreational waterrequirement60 - 180 ppmMaintained in every part of the pool or spa at all times during the daily use period.During daily use periodhigh
#R002chemicaltreatmentmandatorypH Value - Public Pools and Spasrecreational waterrequirement7.2 - 7.8 pH unitsMaintained in every part of the pool or spa at all times during the daily use period.During daily use periodhigh
#R003chemicalhealthmandatoryFree Available Chlorine - Public Poolsrecreational waterrequirement0.5 - 10 ppmFree available chlorine residual in every part of a public pool (excluding floatation/cold plunge pools).Standard public pools during daily use periodhigh
#R004chemicalhealthmandatoryFree Available Chlorine or Total Bromine - Public Spasrecreational waterrequirement5 - 10 ppmResidual in every part of a public spa.During daily use periodhigh
#R005chemicaltreatmentmandatoryOxidation Reduction Potential (ORP)recreational waterrequirement600 - 900 mVIf the pool or spa is equipped with an automatic sensing device.Applicable when automatic sensing device is presenthigh
#R006chemicaltreatmentmandatoryCyanuric Acid Concentration - Outdoor Poolsrecreational waterrequirement<= 60 mg/LWhere cyanurate stabilization is maintained in outdoor pools.Outdoor pools only; no cyanurate stabilization for indoor pools/spashigh
#R007physicalhealthmandatoryMaximum Water Temperature - Public Spasrecreational waterrequirement<= 40 degrees CelsiusMaximum temperature limit set by a tamper-proof upper limit cut-off switch.Mandatory for all public spashigh
#R008chemicalhealthmandatoryFree Available Chlorine - Public Floatation Tankrecreational waterrequirement1.5 - 5 ppmResidual in every part of the floatation tank.During daily use periodhigh
#R009physicalhealthmandatoryWater Temperature - Public Cold Plunge Poolrecreational waterrequirement<= 15 degrees CelsiusMaintained temperature for a public pool defined as a cold plunge pool.Operating as a cold plunge poolhigh
#R010designhealthmandatoryMaximum Water Depth - Public Wading Poolrecreational waterrequirement<= 75 cmArtificial body of water provided for children's use.At any point in the wading poolhigh
#R011operationaltreatmentmandatoryDaily Make-up Water - Public Poolsrecreational waterrequirement>= 15 litres per batherAdded during each operating day.As determined by a water meterhigh
#R012physicaloperationalmandatoryWater Clarity Test Object - Black Discrecreational waterrequirement150 mmDiameter of the black disc on a white background used for clarity testing.Located at the deepest point of the poolhigh
#R013chemicalhealthmandatoryTotal Bromine Residual - Non-Wave Poolrecreational waterrequirement2 - 8 ppmResidual in every part of a pool (other than wave action pools) where bromine is used.Standard pools during daily use periodhigh
#R014chemicalhealthmandatoryTotal Bromine Residual - Wave Action Poolrecreational waterrequirement3 - 10 ppmResidual in every part of a wave action pool where bromine is used.Wave action pools during daily use periodhigh
#R015chemicalhealthmandatoryFree Available Chlorine - Floatation/Cold Plunge Poolrecreational waterrequirement5 - 10 ppmFree available chlorine residual in every part of the public floatation pool or public cold plunge pool.During daily use periodhigh
#R016chemicalhealthmandatoryFree Available Chlorine/Bromine - Hot Water Poolrecreational waterrequirement5 - 10 ppmResidual in every part of a hot water pool operating at 35 degrees Celsius or greater.Temperature >= 35°Chigh
#R017operationaltreatmentmandatoryWater Turnover Rate - Class A Pool (Post-1974)recreational waterrequirement>= 4 times capacity per dayVolume of water filtered, disinfected and passed through the pool each day.Class A pool constructed after April 30, 1974high
#R018operationaltreatmentmandatoryWater Turnover Rate - Class A (Pre-1974) and Class B Poolrecreational waterrequirement>= 3 times capacity per dayVolume of water filtered, disinfected and passed through the pool each day.Class A pool constructed before May 1, 1974, or any Class B poolhigh
#R019operationalhealthmandatoryMaximum Bather Load - Public Sparecreational waterrequirement1 person per square metreMaximum number of persons permitted to use the spa at any one time (based on surface water area).Unless manufacturer's limit is lowerhigh
#R020designreportingmandatoryEmergency Phone Maximum Distancerecreational waterrequirement<= 30 mMaximum distance from the pool or spa to the emergency telephone.Applicable to Class B pools and public spashigh
#R021operationalhealthmandatorySpa Jet Pump Timer Limitrecreational waterrequirement<= 15 minutesMaximum setting for the timing device controlling jet pump operation.Spas containing hydro-massage jet fittingshigh
#R022chemicaltreatmentmandatoryFloatation Tank Total Alkalinityrecreational waterrequirement80 - 120 ppmMaintained in every part of the floatation tank during the daily use period.Public floatation tankshigh
#R023physicalhealthmandatoryFloatation Tank Water Temperaturerecreational waterrequirement< 37 degrees CelsiusMaintained in every part of the floatation tank during the daily use period.Public floatation tankshigh
#R024chemicalhealthmandatoryMinimum Free Chlorine with Cyanurate (Outdoor)recreational waterrequirement>= 1 ppmMinimum free available chlorine residual when cyanurate stabilization is used.Outdoor pools only; cyanuric acid <= 60 mg/Lhigh
#R025chemicalhealthmandatoryMineralized Water - Total Dissolved Solidsdrinking water, agricultural waterrequirement> 6000 mg/LDefinition of mineralized water that triggers abandonment or notification requirements.Found in well waterhigh
#R026chemicalhealthmandatoryMineralized Water - Chloridesdrinking water, agricultural waterrequirement> 500 mg/LDefinition of mineralized water that triggers abandonment or notification requirements.Found in well waterhigh
#R027chemicalhealthmandatoryMineralized Water - Sulphatesdrinking water, agricultural waterrequirement> 500 mg/LDefinition of mineralized water that triggers abandonment or notification requirements.Found in well waterhigh
#R028designoperationalmandatorySealant Bentonite Slurry Densityotherrequirement>= 20 % bentonite solids by weightRequirement for material to be considered a 'sealant' in well construction.Slurry consisting of clean water and bentonitehigh
#R029designoperationalmandatoryShallow Works - Maximum Depthotherrequirement<= 3.0 mMaximum depth for a test hole or dewatering well to be exempt from most regulation provisions.Below the ground surfacehigh
#R030designhealthmandatorySeparation Distance - Drilled Welldrinking waterrequirement>= 15 mMinimum separation from a source of contaminants for a drilled well with casing > 6m depth.Casing extends more than six metres below ground levelhigh
#R031designhealthmandatorySeparation Distance - Non-Drilled or Shallow Casingdrinking waterrequirement>= 30 mMinimum separation from a source of contaminants for non-drilled wells or shallow drilled wells.Casing <= 6m or well is not a drilled wellhigh
#R032chemicalhealthmandatoryWell Disinfection Chlorine Concentrationdrinking water, agricultural waterrequirement50 - 200 mg/LConcentration of free chlorine for well water dosing after construction or pump installation.Water left undisturbed for at least 12 hourshigh
#R033designoperationalmandatoryWell Casing Minimum Heightotherrequirement>= 40 cmHeight of casing above the highest point on the ground surface radially within 3 metres.On completion of the well's structural stagehigh
#R034designoperationalmandatoryAbandonment Surface Seal Thicknessotherrequirement50 - 150 cmVertical thickness of bentonite sealing material placed at the ground surface during abandonment.Bentonite chips, pellets, granules or powder in well openinghigh
#R035designtreatmentmandatorySteel Casing Wall Thickness (Inside Diameter > 50.8 mm)drinking water, agricultural waterrequirement4.78 mmNominal wall thickness for steel casing with an inside diameter of more than 50.8 millimetres.Standard steel casing installationshigh
#R036designtreatmentmandatoryConcrete Casing Wall Thicknessdrinking water, agricultural waterrequirement5.08 cmNominal wall thickness for concrete casing with an inside diameter of 60.96 centimetres or more.Large diameter bored/dug wells using concrete casinghigh
#R037designhealthmandatoryMinimum Casing Depth Below Grounddrinking water, agricultural waterrequirement>= 6 mMinimum length of casing required below the level of the original ground surface.Standard well construction; does not apply to test holes or dewatering wellshigh
#R038designtreatmentmandatoryBored Well Diameter Clearance (Shallow)drinking water, agricultural waterrequirement>= 15.2 cmDiameter of the well relative to the outside diameter of the casing from surface to 2.5m depth.Bored wells with concrete casinghigh
#R039physicaloperationalmandatoryBentonite Sealing Material Particle Sizeotherrequirement6 - 20 mmDiameter of bentonite granules, pellets, or chips used for filling the upper annular space.From ground surface to a depth of at least 2.5 metreshigh
#R040designoperationalmandatoryWell Pit Floor Sealant Thicknessotherrequirement>= 10 cmThickness of the suitable sealant layer covering the floor of a well pit.Permitted well pits (e.g., mineral exploration)high
#R041designoperationalmandatoryAir Vent Minimum Inside Diameter (Large Casing)drinking water, agricultural waterrequirement>= 1.2 cmMinimum inside diameter for an air vent installed on a drilled well pump.Inside diameter of casing is 12.7 centimetres or morehigh
#R042designoperationalmandatoryPitless Adapter Excavation Sealant Widthdrinking water, agricultural waterrequirement>= 20 cmMinimum distance outward from the casing for sealant filling an outside excavation.Where connection to casing is made below ground surfacehigh
#R043physicalreportingmandatoryVisual Examination Water Sample Volumedrinking water, agricultural waterrequirement>= 1 LMinimum volume of a water sample provided to the well purchaser.On the day the structural stage is completehigh
#R044designoperationalmandatoryAbandonment Barrier Top Depth Below Surfaceotherrequirement2 mRequired distance below the ground surface for the upper limit of the abandonment barrier column.During well abandonment plugging processhigh
#R045chemicalhealthmandatoryMaximum Free Chlorine Residual for Pump Outdrinking water, agricultural waterrequirement< 1 mg/LConcentration threshold to which chlorinated water must be pumped out of a well.Following unsuccessful initial disinfection or as final step of disinfectionhigh
#R046chemicaltreatmentmandatoryBentonite Sodium Montmorillonite Contentotherrequirement> 50 % by weightConstituent requirement for material to be classified as 'bentonite' for well use.Commercially produced sealing materialhigh
#R047designoperationalmandatoryTremie Pipe Minimum Inner Diameter Ratiootherrequirement>= 3 x particle diameterMinimum internal size of a tremie pipe relative to the material passing through it.Used to conduct material to the bottom of a holehigh
#R048designtreatmentmandatorySteel Casing Wall Thickness (Small Inside Diameter)drinking water, agricultural waterrequirement2.77 mmNominal wall thickness for steel casing with an inside diameter of 50.8 millimetres or less.Standard steel casing installationshigh
#R049designoperationalmandatoryCasing Extension Height Above Surrounding Floordrinking water, agricultural waterrequirement>= 15 cmRequired extension of well casing above a surrounding floor where a pump is installed.Floor constructed around/adjacent to casing; pump above/adjacenthigh
#R050designoperationalmandatoryStandard Buffer Area Widthotherrequirement>= 100 metresThe buffer area shall be at least 100 metres wide at every point surrounding the waste fill area.Standard requirement unless reduced by technical reporthigh
#R051designoperationalmandatoryReduced Buffer Area Widthotherrequirement>= 30 metresMinimum buffer width allowed if a written report confirms the area is sufficient for operations and impacts.Requires technical report confirmationhigh
#R052operationalhealthmandatoryMethane Concentration at Site Boundaryotherrequirement< 2.5 % by volumeThe concentration of methane gas below the surface of the land at the boundary of the site.During site operation and post-closurehigh
#R053operationalhealthmandatoryMethane Concentration in On-Site Buildingsotherrequirement< 1.0 % by volumeConcentration in any on-site building or enclosed structure and immediately outside foundations.Applicable if structure contains electrical equipment or potential ignition sourceshigh
#R054designoperationalmandatoryInfiltration Rate through Final Coverotherrequirement>= 0.15 metres per yearInfiltration rate used for generic ground water protection designs.Generic design options under subsections 10(4) and 10(5)high
#R055designtreatmentmandatoryPrimary Clayey Liner Thicknessotherrequirement>= 0.75 metresThickness of the clayey liner for ground water protection systems.Standard generic design; must be compacted in at least 5 lifts (Schedule 4)high
#R056designtreatmentmandatoryPrimary HDPE Liner Thicknessotherrequirement>= 1.5 millimetresThickness of the high density polyethylene (HDPE) geomembrane liner.Used for 150-year service life designhigh
#R057operationalreportingmandatoryDaily Records Retention Periodotherrequirement>= 2 yearsThe owner and operator shall ensure daily records of site operations are retained.After the records are madehigh
#R058designoperationalmandatoryFinal Cover Material Thicknessotherrequirement>= 0.6 metresMinimum thickness of cover material applied to the waste fill zone.Bottom layer of the final coverhigh
#R059designoperationalmandatoryFinal Cover Topsoil Thicknessotherrequirement>= 0.15 metresMinimum thickness of topsoil or approved material to sustain plant growth.Middle layer of the final coverhigh
#R060designoperationalmandatoryMaximum Final Slopeotherrequirement1:4 vertical to horizontal ratioMaximum final slopes above grade within the waste fill zone at site closure.Unless alternative design for slope stability is preparedhigh
#R061designoperationalmandatoryMinimum Final Slopeotherrequirement1:20 vertical to horizontal ratioMinimum final slopes above grade within the waste fill zone at site closure.Unless alternative design for drainage/stability is preparedhigh
#R062designoperationalmandatoryTotal Waste Disposal Volume Triggerotherrequirement> 40000 cubic metresRegulation applies to sites intended to have this volume and accept only municipal waste.New sites or extensions after August 1, 1998high
#R063physicalreportingmandatoryBackground Concentration Sample Sizeotherrequirement>= 5 samplesMedian value for a contaminant based on all ground water samples taken from the receptor aquifer.Taken at or near the site boundaryhigh
#R064chemicalhealthmandatoryX-Factor (Health Related)otherrequirement0.25 scalarValue of X in the maximum allowable concentration formula when Cr is a health related drinking water objective.Formula: Cm = Cb + (Cr - Cb) * Xhigh
#R065designtreatmentmandatoryAttenuation Layer Thickness (Single Liner)otherrequirement>= 3 metresThickness of natural or engineered soil layer at the base of the waste fill zone for attenuation.Subsection 10 (4) generic designhigh
#R066designtreatmentmandatoryAttenuation Layer Thickness (Double Liner)otherrequirement>= 1 metresThickness of natural or engineered soil layer at the base of the waste fill zone for attenuation.Subsection 10 (5) generic designhigh
#R067operationalhealthmandatoryOff-site Building Methane Concentrationotherrequirement< 0.05 % by volumeThe concentration of methane gas from the site in any off-site building or enclosed structure.If building contains electrical equipment or potential ignition sourceshigh
#R068designoperationalmandatoryGas Collection System Volume Triggerotherrequirement> 1.5 million cubic metresRequirement to prepare a report for the collection and burning/use of landfill gas.New or increased site volume exceeds this thresholdhigh
#R069operationalhealthmandatoryMinimum Post-Closure Contaminating Life Spanotherrequirement>= 25 yearsMinimum period for estimating costs related to leachate for financial assurance.From the date waste is last deposited at the sitehigh
#R070operationalreportingmandatoryAnnual Operations Report Deadlineotherrequirement<= 3 monthsDeadline to prepare an annual report after each anniversary of the date waste was first accepted.high
#R071designtreatmentmandatoryStone Layer Base Thickness (LCS)otherrequirement>= 0.5 metresMinimum thickness of stones in the primary leachate collection system layer elsewhere than the side slopes.100-Year Service Life conditionhigh
#R072designtreatmentmandatoryLCS Stone Gradation D85otherrequirement>= 37 millimetresStone diameter such that 85 per cent of the stones in the layer have a smaller diameter.high
#R073designtreatmentmandatoryLCS Stone Fine Contentotherrequirement<= 1.0 % by weightMaximum amount of stones that may pass the US #200 sieve.high
#R074designtreatmentmandatoryLeachate Pipe Internal Diameterotherrequirement>= 150 millimetresMinimum internal diameter for perforated HDPE leachate collection pipes.high
#R075designtreatmentmandatoryLeachate Pipe Perforation Diameterotherrequirement>= 12 millimetresMinimum perforation diameter for leachate collection pipes.high
#R076designtreatmentmandatoryLCS Drainage Path Spacing (100yr)otherrequirement<= 50 metresMaximum drainage path length before leachate can potentially intercept a collection pipe.100-Year Service Lifehigh
#R077designtreatmentmandatoryClay Liner Lift Thicknessotherrequirement<= 0.15 metresMaximum compacted thickness for each of the lifts in which the liner is compacted.high
#R078chemicalhealthmandatoryTable 1: Benzene Health ObjectiveotherMAC0.005 mg/LHealth Related Drinking Water Objective for ground water protection design.high
#R079chemicalaestheticmandatoryTable 1: Chloride Aesthetic ObjectiveotherAO250 mg/LAesthetic Drinking Water Objective for ground water protection design.high
#R080chemicalhealthmandatoryTable 1: Vinyl Chloride Health ObjectiveotherMAC0.002 mg/LHealth Related Drinking Water Objective for ground water protection design.high
#R081designoperationalmandatoryMax Waste Loading (Single Liner, 0 Background Chloride)otherrequirement98500 m3/haMaximum waste loading for generic single liner design option.Background Chloride Concentration = 0 mg/Lhigh

D Definitions (17)

Req ID Category Name Context Confidence
#D001base side slopeany portion of the base of the waste fill zone extending from ground surface downward at an angle steeper than one unit vertical to four units horizontalhigh
#D002buffer areathat part of a landfilling site that is not waste fill areahigh
#D003contaminant attenuation zonea three-dimensional zone that, (a) is located on land adjacent to a landfilling site, (b) is in the subsurface or extends into the subsurface, and (c) is used or is intended to be used for the attenuation of contaminants from the landfilling site to levels that will not have an unacceptable impact beyond the boundary of the zonehigh
#D004contaminating life span(a) in respect of a landfilling site, the period of time during which the site will produce contaminants at concentrations that could have an unacceptable impact if they were to be discharged from the site, and (b) in respect of a landfilling site and a contaminant or group of contaminants, the period of time during which the site will produce the contaminant or a contaminant in the group at concentrations that could have an unacceptable impact if they were to be discharged from the sitehigh
#D005maximum waste loadingfor a landfilling site, the total waste disposal volume divided by the area of the waste fill areahigh
#D006primary leachate collection systemthe uppermost leachate collection system below the waste fill zonehigh
#D007primary linerthe uppermost liner below the waste fill zonehigh
#D008secondary leachate collection systema leachate collection system located below the primary leachate collection systemhigh
#D009secondary linera liner located below the primary linerhigh
#D010service lifethe period of time during which a properly maintained engineered facility will function in accordance with the performance specifications for its designhigh
#D011unacceptable impactinterference with existing or potential reasonable uses of, (a) land, (b) ground water in or under land, or (c) surface water on landhigh
#D012waste fill areathe area on the surface of a landfilling site beneath which or above which waste is disposed of by landfillinghigh
#D013background concentration of a contaminantthe median value for that contaminant based on all ground water samples taken from the receptor aquifer in accordance with the following rules: 1. At least five samples must be taken. 2. The samples must be taken at or near the site boundary where the potential impact is being examined. 3. The samples must not be taken from locations known to be or likely to be contaminated by human activity.medium
#D014D85for stones in a stone layer is the stone diameter such that, when measured by weight, 85 per cent of the stones in the layer have a smaller diameterhigh
#D015D60for stones in a stone layer is the stone diameter such that, when measured by weight, 60 per cent of the stones in the layer have a smaller diameterhigh
#D016D10for stones in a stone layer is the stone diameter such that, when measured by weight, 10 per cent of the stones in the layer have a smaller diameterhigh
#D017building codeThe code issued by the Canadian Commission on Building and Fire Codes, part of National Research Council Canada, known as CCBFC NRCC-CONST-56435E, ‘National Building Code of Canada 2020’, (First Printing), as amended by the document entitled ‘Ontario Amendments to the National Building Code of Canada 2020’, dated April 21, 2026 and issued by the Ministry of Municipal Affairs and Housing, are together adopted as the building code.high