| #Q001 | prohibition | unknown | mandatory | Disposal Permit Prohibition | other | Disposal at sea is prohibited without a permit issued by the Environment and Climate Change Canada Disposal at Sea Program under the Canadian Environmental Protection Act, 1999 (CEPA). | Applies when any substance is loaded onto a ship, aircraft, platform or other structure and released into the sea or estuarine environment | high |
| #Q002 | administrative | operational | mandatory | Pre-application Consultation | other | Consult with regional Program staff to ensure all pre-application required information is provided and the assessment is completed prior to submitting the application. | Prior to submitting the permit application | high |
| #Q003 | administrative | reporting | mandatory | Application Form Completion | other | The prescribed application form (set out by the Disposal at Sea Permit Application Regulations) and supporting documentation must be completed to meet the requirements outlined in CEPA. | During submission of application phase | high |
| #Q004 | administrative | reporting | mandatory | Application Form Mail Submission | other | Once you have accessed a form, you can fill in the fields, electronically in the case of the PDF, but you must print the form for submission by mail to the nearest Disposal at Sea Program regional office. | When submitting the application form | high |
| #Q005 | reporting | reporting | mandatory | Permit Registry Publication | other | We must publish a copy of the permit and its conditions to the CEPA Registry. | Following permit assessment and decision | high |
| #Q006 | operational | operational | mandatory | Operations Compliance | other | You may begin project operations on the permit’s start date, and in accordance with the conditions stipulated in the permit. | After permit is issued and upon start date | high |
| #Q007 | reporting | reporting | mandatory | Permit Changes Publication | other | Any changes made to a disposal at sea permit must be published on the CEPA Registry. | If permit conditions are varied during the specified term | high |
| #Q008 | monitoring | operational | mandatory | Periodic Site Inspections | other | After a permit has been issued, periodic inspections will be conducted at both the load site and disposal site to ensure compliance with the permit conditions. | After a permit has been issued | high |
| #Q009 | monitoring | reporting | mandatory | Effluent Quality Monitoring and Reporting | wastewater | The owners or operators of wastewater systems must monitor and report the quality of their effluent to show that they are meeting the standards. | Applies to wastewater systems collecting average daily volume of 100 m3 or more | high |
| #Q010 | prohibition | health | mandatory | Acute Lethality Prohibition | wastewater, aquatic life | The effluent also cannot be acutely lethal. | Standard designed to be achievable through secondary wastewater treatment | high |
| #Q011 | reporting | reporting | mandatory | Initial Identification Report | wastewater | Owners or operators of wastewater systems must submit an identification report within 45 days after their system comes into operation. | Within 45 days of system coming into operation | high |
| #Q012 | reporting | reporting | mandatory | Identification Information Updates | wastewater | Any changes or new information on the wastewater system must be submitted within 45 days of the change. | When system information or owner/operator details change | high |
| #Q013 | reporting | reporting | mandatory | Regular Monitoring Report Submission | wastewater | Owners and operators must submit monitoring reports regularly. | Frequency (quarterly or annual) is determined by system type and size | high |
| #Q014 | reporting | reporting | mandatory | Combined Sewer Overflow Monthly Reporting | wastewater | Owners or operators of wastewater systems with at least one combined sewer overflow point are required to report for each month where a deposit occured: the number of days that effluent was released via each overflow point; the volume of effluent deposited from each overflow point | Applies for each month where a deposit occurred | high |
| #Q015 | reporting | reporting | mandatory | Annual Combined Sewer Overflow Report Deadline | wastewater | Owners and operators must submit the combined sewer overflow report once per year by February 15. | Annual submission required for systems with overflow points | high |
| #Q016 | reporting | reporting | mandatory | Quarterly Monitoring Reporting Deadlines | wastewater | For owners or operators of wastewater systems that report four times a year, the deadlines are: Quarter 1 (January 1 to March 31) - May 15; Quarter 2 (April 1 to June 30) - August 14; Quarter 3 (July 1 to September 30) - November 14; Quarter 4 (October 1 to December 31) - February 14 | Applies to systems required to report four times a year | high |
| #Q017 | reporting | reporting | mandatory | Annual Monitoring Reporting Deadline | wastewater | For wastewater systems that report once a year, the deadline is: Annual (January 1 to December 31) - February 14 | Applies to systems required to report once a year | high |