Parameter Viewer

Document ID ca-on-spwtcsdafd-2023-09-05 Title Streamlining permissions for water takings for construction site dewatering activities and foundation drains URL unknown Jurisdiction /ca/on Subdomain(s) Permitting, zoning & urban planning Language en Status completed Analyzed at 2026-03-29 21:49:10.587418+00:00 Relevance This is a public comment on a proposed regulatory change for water taking permits.

Q Qualitative Requirements (0)

No qualitative requirements.

P Quantitative Requirements (12)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001operationaloperationalunknownExemption quantity for PTTWs for Foundation Drainageotherrequirement50,000 L/dayproposed increase in the exemption quantity for PTTWs for Foundation Drainage from 50,000 L/daymedium
#P002operationaloperationalunknownLimit for foundation drainage for EASRsotherrequirement379,000 L/daychoice of 379,000 L/day limit for foundation drainage for EASRsmedium
#P003operationaloperationalunknownLimit for construction dewatering EASRs and Category 2 PTTWsotherrequirement400,000 L/dayThe current 'limit' for construction dewatering EASRs and Category 2 PTTWs is 400,000 L/day.high
#P004operationaloperationalunknownProposed change limit for foundation drainageotherrequirement100,000 U.S. Gallons/dayWhy is the proposed change going to be 100,000 U.S. Gallons/day?medium
#P005operationaloperationalrecommendedSuggested limit for foundation drainage (Imperial)otherrequirement100,000 Imperial gallons/dayuse 100,000 Imperial gallons/day (455,000 L/day)high
#P006operationaloperationalrecommendedSuggested limit for foundation drainage (Metric equivalent)otherrequirement455,000 L/dayuse 100,000 Imperial gallons/day (455,000 L/day)high
#P007operationaloperationalrecommendedSuggested arbitrary limit for foundation drainageotherrequirement350,000 L/daychoose an arbitrary limit, such as 350,000 or 375,000 L/dayhigh
#P008operationaloperationalrecommendedSuggested arbitrary limit for foundation drainageotherrequirement375,000 L/daychoose an arbitrary limit, such as 350,000 or 375,000 L/dayhigh
#P009operationaloperationalrecommendedSuggested limit for foundation drainage (Metric typo)otherrequirement327,00 L/dayperhaps 327,00 L/day [equivalent to 50 Imperial Gallons per minute (IGPM)]high
#P010operationaloperationalrecommendedSuggested limit for foundation drainage (IGPM equivalent)otherrequirement50 IGPMperhaps 327,00 L/day [equivalent to 50 Imperial Gallons per minute (IGPM)]high
#P011operationaloperationalrecommendedSuggested limit for foundation drainage (Metric)otherrequirement392,000 L/dayor 392,000 L/day (60 IGPM)high
#P012operationaloperationalrecommendedSuggested limit for foundation drainage (IGPM)otherrequirement60 IGPMor 392,000 L/day (60 IGPM)high

D Definitions (0)

No definitions.