Parameter Viewer

Document ID ca-on-slspa-2022 Title Streamlining Low-Risk sewage project approvals URL unknown Jurisdiction /ca/on Subdomain(s) Wastewater Language en Status completed Analyzed at 2026-03-29 22:41:25.575410+00:00 Relevance Contains public feedback on proposed regulatory changes for sewage approvals.

Q Qualitative Requirements (2)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryProponent Mitigation Measures for Construction Site DewateringotherUnder the requirements of the proposed exemption, proponents would be required to implement any necessary measures to ensure that water quantity and quality are not affected upstreamUnder the requirements of the proposed Construction Site Dewatering exemptionmedium
#Q002administrativeoperationalmandatoryMinistry Authority for Sewage Works InspectionwastewaterThe ministry would maintain the authority to inspect the sewage works and ensure compliance with all legislative and regulatory requirements and to ensure that the works do not pose an adverse impact.medium

P Quantitative Requirements (1)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001operationaloperationalunknownFoundation drainage treatment volumewastewater, otherrequirement< 50000 L/dayIf a site is taking and treating less than 50,000 L/day of foundation drainage for discharge to a storm sewer and a PTTW is not required, will an ECA still be required?Discharge to a storm sewer where a Permit to Take Water (PTTW) is not required.low

D Definitions (0)

No definitions.