Parameter Viewer

Document ID ca-ab-aqpute-2023 Title Aquifer pump tests URL https://www.alberta.ca/aquifer-pump-tests Jurisdiction /ca/ab Subdomain(s) Groundwater, Permitting Language en Status completed Analyzed at 2026-03-24 05:14:11.243812+00:00 Relevance Defines mandatory pump test requirements for well construction and licensing.

Q Qualitative Requirements (4)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001monitoringoperationalmandatoryMandatory pump tests for new or deepened wellsdrinking water, agricultural water, otherPump tests are now mandatory in Alberta on all newly constructed wells or wells deepened to access a lower aquifer.On all newly constructed wells or wells deepened to access a lower aquiferhigh
#Q002designoperationalmandatoryObservation wells for large volume applicationsdrinking water, agricultural water, otherIn licensed applications involving larger volumes of water the proponent will drill one or more observation wells, in addition to the production well(s).In licensed applications involving larger volumes of waterhigh
#Q003designoperationalmandatoryRestriction on multi-aquifer well accessdrinking waterIn some areas of Alberta, drillers frequently access 2 or more aquifers through one well for higher yield and greater reliability of supply. This is done for domestic wells only where there is little water available.Only where there is little water available for domestic wellsmedium
#Q004monitoringoperationalrecommendedIndependent wells and pumping tests per aquiferdrinking water, otherTo determine a safe yield, each aquifer should have its own well and independent pumping test.When accessing multiple aquifers to determine a safe yieldhigh

P Quantitative Requirements (4)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designoperationalmandatoryObservation wellsotherrequirement>= 1 wellsIn licensed applications involving larger volumes of water the proponent will drill one or more observation wells, in addition to the production well(s).Licensed applications involving larger volumes of watermedium
#P002operationaloperationalmandatorySafe yield calculation durationotherrequirement20 yearsAlberta's safe yield is the rate at which a given well could pump continuously for 20 years.high
#P003designoperationalrecommendedIndependent aquifer wellsotherrequirement1 well per aquiferTo determine a safe yield, each aquifer should have its own well and independent pumping test.When attempting to determine safe yield for multiple aquifershigh
#P004operationaloperationalmandatoryMandatory pump testotherrequirement1 test per wellPump tests are now mandatory in Alberta on all newly constructed wells or wells deepened to access a lower aquifer.Newly constructed wells or wells deepened to access a lower aquiferhigh

D Definitions (0)

No definitions.